11 NUM DELTA ARC RADIUS BEARING DISTANCE C1 60°41'00" 222.42' 210.00' §59°40'30"W 212.17' C2 40°54'02" 117.78' 165.00' S26 -1,3'35"W 115.30' -0- 4 0 30 100 GRAPHIC SCALE 1 "=30' CAUTION EXISTING UTILITIES !!!! All existing utilities and underground facilities that are indicated and shown on these plans are approximate, and are based on as -built plans and/or from reference information. Actual utility locations may differ from the as -built plans based on field observations. All utilities shall be field verified and located prior to any excavation or boring. It shall be the responsibility of the Contractor to verify both horizontally and vertically the location of such existing utilities prior to any construction. Lot 1, Block A DRAINAGE & UTILITY EASEMENT Lot 2, Block A Excel - Phase 2 Vol. 83242, Pg. 4530, D.R.D.C.T. Excel Plaza Vol. 96064, Pg. 4820, D.R.D.C.T. j Inst. No. 2010000010278, O.P.R.D.C.T. Luzzatto Excel LLC 16650 West Grove Dr Holdinas LP 19 5' TP Rr I /4WRT FASFMFNT r - gn' I ITII ITY FASFMFNT 1-+ o0non0o7Q1 z1 n D D n r T Tract VI, Block B Sunbelt Business Park Vol. 80092, Pg 808, D.R.D.C.T. Reinhard & Hannelore Kral Vol. 2000146, Fg. 3980, D.R.D.C.T. TBM: Square cut with "X" on top of curb inlet located on the north side of Sunbelt Drive approximately 100 feet west of the southeast corner of the subject property. 0.90 10 Elevation 631.9 TBM: Square found on the top east end of a concrete headwall located north of the north property line and 2 feet northwest of the northeast property corner of the subject property. Elevation 635.11 MISC. INFORMATION NOTE: Prior to beginning any construction or construction staking, it shall be the Contractor's responsibility to contact the civil engineer to insure that all parties are in possession of the most current set of construction documents. 10' SANITARY SEWER EASEM 10' SANITARY SEWER EASEMENT Inst. No. 201400013669 O.P.R.D.C.T. REVISION I DATE i2W Drainage Area (Acres) H, I C = 0.90 1100 (in/hr) Q100 (cfs) Notes = 1100 9.27 in/hr 0.10 0.90 10 tc = 10 min. 0.8 Detention Pond A to Sunbelt Dr. System B1 0.40 0.90 10 9.27 D.A. No. Acres To Detention Pond A B2 0.81 proposed Drainage Area 10 9.27 / XX.X Q100 (cfs) Calculations 133 0.57 0.90 10 9.27 4.8 ` LEGEND 0.03 0.90 10 9.27 0.3 Detention Pond B to Detention Pond A 1/ "FIR Proposed Drainage Divide Line �� f. 10 �% •- Flow Direction To Detention Pond B D3 0.09 0.90 7 i City Project #16-09 PRELIMINARY DRAINAGE AREA MAP Drainage Area No. Drainage Area (Acres) C t, (min) 1100 (in/hr) Q100 (cfs) Notes Al 0.10 0.90 10 9.27 0.8 Detention Pond A to Sunbelt Dr. System B1 0.40 0.90 10 9.27 3.3 To Detention Pond A B2 0.81 0.90 10 9.27 6.8 To Detention Pond A 133 0.57 0.90 10 9.27 4.8 To Detention Pond A D1 0.03 0.90 10 9.27 0.3 Detention Pond B to Detention Pond A D2 0.08 0.90 10 9.27 0.7 To Detention Pond B D3 0.09 0.90 10 9.27 0.8 To Detention Pond B D4 0.87 0.90 10 9.27 7.3 To Detention Pond B 0S1 0.27 0.90 10 9.27 2.3 To Sunbelt Drive Drainage System OS2 0.14 0.90 10 9.27 1.2 To Sunbelt Drive Drainage System OS3 0.13 0.90 10 9.27 1.1 To Sunbelt Drive Drainage System EX 0.35 0.90 10 9.27 2.9 To Existing Drainage Channel DESCRIPTION RLK ENGINEERING, INC. I I I West Main Allen, Texas 75013 (972) 359-1733 Off (972) 359-1833 Fax Texas Registration No. 579 THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF RONNY KLINGBEIL, P.E. NO. 76831 ON JUNE 13, 2016. IT IS NOT TO BE USED FOR DESIGNED BY: CONSTRUCTION, BIDDING. OR RLK Engineering PERMIT PURPOSES. DRAWN BY. RLK Engineering Tract 15, Block B, Sunbelt Business Park ADDISON, TEXAS TECH REVIEW: DRAWING FILE: DRAWING SCALE: RLK 16032 DAMAP.dwg PEER REVIEW: DRAWING DATE: PROJECT NUMBER: RLK 6-13-16 RLK: 16032 SHEET: NUM DELTA ARC RADIUS BEARING DISTANCE C1 60°41'00" 222.42' 210.00' S59°40'30"W 212.17' C2 40°54'02" 117.78' 165.00' S26.13'35"W 115.30' = = 4 0 30 100 GRAPHIC SCALE 1 "=30' CAUTION EXISTING UTILITIES !!!! All existing utilities and underground facilities that are indicated and shown on these plans are approximate, and are based on as -built plans and/or from reference information. Actual utility locations may differ from the as -built plans based on field observations. All utilities shall be field verified and located prior to any excavation or boring. It shall be the responsibility of the Contractor to verify both horizontally and vertically the location of such existing utilities prior to any construction. GENERAL NOTES 1. All materials and construction shall be in accordance with the Town of Addison Standard Specifications and Construction Standards, and Standard Specifications for Public Works Construction prepared by North Central Texas Council of Governments (Latest Revision). 2. Existing utilities are shown schematically and are for the contractors guidance only. The location and/or elevation of existing utilities as shown on these plans are based on records of the various utility companies, and, where possible, measurements taken in the field. The contractor must call the appropriate utility company at least 48 hours prior to any excavation to request exact field location of utilities. 3. The contractor shall be responsible for protecting all existing improvements in the construction of this project. The contractor is responsible for repairs of damage to any existing improvements during construction. Repairs shall be equal to or better than condition prior to construction. 4. All storm sewer pipe 12" and larger shall be Class III RCP. All storm sewer pipe 12" and smaller shall be HDPE drainage pipe or approved equal. 5. Contractor shall be responsible for maintaining trench safety requirements in accordance with the latest standards of O.S.H.A. or any other agency having jurisdiction for excavation and trenching procedures. Contractor shall provide and implement a trench safety plan complying with O.S.H.A. Lot 1, Block A Lot 2, Block A 5' TP W T A M 1 "X" on top of Excel - Phase 2 DRAINAGE & UTILITY EASEMENT Percent Excel Plaza a 100 feet Vol. 96064, Pg. 4820, D.R.D.C.T. Vol. 83242, Pg. 4530, D.R.D.C.T. Outflow Inst. No. 2010000010278, O.P.R.D.C.T. Storage Minor Losses Elevation 631.59 rl s� '� 01000/, 16650 West Grove Dr Holdin s LP 12 Volume �o Luzzatto Excel LLC Boxes 9 & L/S B ESE ENT 20 UTILITY EASEMENT Inst. 200900278131, O.P.R.D.C.T. Inst. 201200062933, O.P.R.D.C.T. Vol. 81202, P 777 & Concrete Pg. Vol. 96064, Pg. 4820, D.R.D.C.T. Vol. 85040, P 1311, D.R.D.C.T. � Headwall 6 RCP S89°59'00"E 8' Chain Link FenceConcrete „—„ „„ 24.47' Pavement i4p Y 7 -:E , , µ_.. „ 1 /2"FIR 8"ELM LM 8"ELM 8"ELM 8"ELM 8"ELM 8"ELM 8"ELM 8 ELM ECMO 8 ELM 8"ELM��L SD SD l �� SHEUBS erial Utili y Li es n 6 Cro sar N ~Focnd PK Na 0 '; —,- Concrete rn Rip Rap Concrete Pavement DRAINAGE EASEMENT w Vol. 97176, Pg. 4307, D.R.D.C.T. 0 o 00 0 0 6 Co S O' o ro a Z 2+49 Line B 2+53 Line B1Z 27C.06' " E 18 45' Bend Begin Trench Drain O 30' DRAINAGE EASEMENT Vol. 77215, Pg. 2834, D.R.D.C.T. O One Story ,® Concrete Finished Floor = 637.50 Iq (/) A= 18 n= 59.07'48» 5/8 SIR R = 150.00' " Tract 14, Block B Z L = 139.09'_Sunbelt Business Park �3 Install Trench Drain - 35 L.F. ® Vol. 97176, Pg. 4307, D.R.D.C. O° Finished Floor = 637.50 4385 Sunbelt Dr LLC W 3+80 L'ne D Inst. No. 201 1 0021 7868, O.P.R.D. Const. Std. 5 Curb R = 112:00; " 25' DRAINAGE EASEMENT = 58'44'14" G Vol. 97176, Pg. 4307, D.R.D.C.T. 0+04 Lat D-2 1+33 Line B Const. Std. 5' Curb Inlet 0+00 Lat A-1 21"x 12" Wye tiel 18RCP SD Install Trench drain - 86 L.F. 2+94 Line ID `Q 1+33 Line B 1+42 Line D 18"-30' Bend e QGQ 21"-45' Bend 0+00 Lat D-2 N� 18"x 12" WyecRae Concrete Pavement „i L Finished Floor = 637.50 04 t D-1 18RCP Private _-.... Co t. Std. 5' Curb Inlet N 00'01'00" E / 6 0+04 Lot B-1 13.75' Begin Trench Drain +92 Line D - ----- a 0+00 Lat D-1 �2a� Z 18% 12" Wye Concrete Pavement it N End RCP cut with "X" on top of curb inlet located on the north side of 1/2"FIR Percent Const.t. Std. 5' Curb / 100 feet west Of the southeast corner of the Inflow Outflow Inlet, Begin 21" RCP Storage Minor Losses Elevation 631.59 rl s� '� 01000/, Discharge Volume �o Volume Volume Boxes TBM: Square found on the top east end of a concrete headwall located north Cu. Ft. (minutes) Tract VI, Block B property line and 2 feet northwest of the northeast property i 0:93 Sunbelt Business Park subject property. Drainage & Detention Vol. 80092, Pg. 808, D.R.D.C.T. 10 9.27 Easement 32.0 A� 20 5,742 13,480 15 7.99 Reinhard & Hannelore Kral 27.6 24,852 25 7,178 17,675 Vol. 2000146, Pg. 3980, D.R.D.C.T. 20 7.05 2.35 24.4 29;238 CD 8,113 20,625 Pipe 30 5.77 2.89 19.9 35;594 40 11,484 24,410 Upstream 40 3.86 2.57 13.3 32,016 50 14,355 17,661 (ft) 60 3.86 3.46 13.3 48,025 70 20,097 27,928 °lo ( � 120 2.45 4.90 8.> 60,964 0+00 Line \\ 37,323 23.641 > / Begin 21” RCP Const. \ 3.9 83,608 370 106,227 (22,619) Sloped End Headwall \ (fps) 0,0 Points(ft)Loss (Eley.) (Eley,) Required Storage Volume 27,928 cubic feet Drainage & Detention 0.64 Easement CS CP \ /� 0+00 0+00 Line C Begin 18 RCP Const. \ Sloped End Headwall \ Proposed Walled \\ / Detention Area 0+17 Line A End 24" IRCIP Const. f " With Headwall " Type B Hea Orifice Plate & Trash Rack \ Per Addison Standards. 10' SANITARY SEWER EASEMENT \\ o' bO 10' SANITARY SEWER EASEMENT Inst. No. 201400013669 / O.P.R.D.C.T. / TBM: Square cut with "X" on top of curb inlet located on the north side of 1/2"FIR Percent Sunbelt Drive approximately 100 feet west Of the southeast corner of the Inflow Outflow subject property. Storage Minor Losses Elevation 631.59 rl s� '� Depth Discharge Volume Duration. Volume Volume Boxes TBM: Square found on the top east end of a concrete headwall located north Cu. Ft. (minutes) of the north property line and 2 feet northwest of the northeast property i 0:93 corner of the subject property. Elevation 635.11 / 10 9.27 1.55 32.0 19,222 20 MISC.INFORMATION TEVISION DATE DESCRIPTION NOTE: Prior to beginning any construction or construction staking, it shall be the Contractor's responsibility to contact the civil engineer to insure that all parties are in possession of the most current set of construction documents. \ » S 3 Gas M Z 10' DRAINAGE & UTILITY EASEMENT 2� ssMH Vol. 83048, Pg. 1523, D.R.D.T. Arch Metal '.pay SUNBELT DRIVF L O 60' Public ROW, 37' Concrete Pavement Ex. 12"W ly MODIIZED RATIONAL METHOD DETENTION BASIN DESIGN PROJECT: Sunbelt - 100YR June 14, 2016 / Runoff: Coefficient Ck = 0.90 Begin 18" RCP, Const. Sloped End Headwall Proposed Walled I Detention Area 0+00 Line C End 18" RCP, Const. Sloped End Headwall Errergency Overflow Pe- Addison Standards. Emergency Overflow Per Addison Standards 0+00 Line A Connect To Existing 8'x5' Co Begin 24" RCP RLK ENGINEERING, INC 11 I West Main Allen, Texas 75013 (972) 359-1733 Off (972) 359-1833 Fax Texas Registration No. 579 Drainage Area - A = Time of Concentration - tc = Maximum Outflow Rate - Q = 3.84 10 9.6 minutes c f s Site 3.84 (Minus OS 1-3 - EX = 0, 89a) Percent # of Selected Height Inflow Inflow Outflow Outflow Storage Minor Losses Duration Intensity Depth Discharge Volume Duration. Volume Volume Boxes (minutes) (inches/hr) (inches) Q-=CkiA Cu. Ft. (minutes) Cu. Ft. Cu. Ft. Down- 5 11.17 0:93 38.6 11,581 15 4,307 7,275 10 9.27 1.55 32.0 19,222 20 5,742 13,480 15 7.99 2.00 27.6 24,852 25 7,178 17,675 20 7.05 2.35 24.4 29;238 30 8,113 20,625 Pipe 30 5.77 2.89 19.9 35;594 40 11,484 24,410 Upstream 40 3.86 2.57 13.3 32,016 50 14,355 17,661 (ft) 60 3.86 3.46 13.3 48,025 70 20,097 27,928 °lo ( � 120 2.45 4.90 8.> 60,964 130 37,323 23.641 3601 1.12 6.72 3.9 83,608 370 106,227 (22,619) (fps) 0,0 Points(ft)Loss (Eley.) (Eley,) Required Storage Volume 27,928 cubic feet 0.64 acre-feet STORM SEWER CALCULATIONS Runoff Collection Point Distance Added Accum- 0 (Ca>) Percent # of Selected Height Slope Velocity in Y Velocity y Frictional Minor Losses HGL Between Flow Between utated Full Boxes Storm (Box} Slope of Sewer Head Head Down- HGL Down- Up- U Collection Collection Flow In Sewer Hydraulic Between Loss at Loss MH & stream. Upstream p stream stream Points Points Pipe (c`s. (°lop (#} Size (gxft } { °�° Gradient "S" Collection Upstream Between Junction Bend Expansion Collection Collection. Station Station (ft) (cfs) (els) (in) °lo ( � Points IV" Station "Hy' Collection Loss Loss Point Point (fps) (ft) Points(ft)Loss (Eley.) (Eley,) City Project #16-09 THIS DOCUMENT IS RELEASED PRELIMINARY D RAI N ,U G PLAN FOR THE PURPOSE OF INTERIM m 1 i� ��117 �� L � LTA REVIEW UNDER THE Tract 1 5 Block B Sunbelt Business Park AUTHORITY OF BONNY , , KLINGBP.E. 76831 ON JUNE ADDISON TEXAS JUNE 13,, 2 2016. IT IS NOT TO BE USED FOR DESIGNED BY: TECH REVIEW: DRAWING FILE: DRAWING SCALE: SHEET: CONSTRUCTION, BIDDING, OR RLK Engineering RLK 16032 Drg.dwg 1 "=30' PERMIT PURPOSES. DRAW ING DATE: PROJECT NUMBER: r RAWN BY: PEER REVIEW: r RLK Engineering RLK 6-13-16 RLK 16032 C 3 NUM DELTA ARC RADIUS BEARING DISTANCE C1 60°41'00" 222.42' 210.00' S59°40'30"W 212.17' C2 40°54'02" 117.78' 165.00' S26°13'35"W 115.30' =0= 0 30 100 GRAPHIC SCALE 1 "= 30' -- 1/2 FIR 8" �. ,.. B UUP-p UP T CAUTION EXISTING UTILITIES !!!! All existing utilities and underground facilities that are indicated and shown on these plans are approximate, and are based on as -built plans and/or from reference information. Actual utility locations may differ from the as -built plans based on field observations. All utilities shall be field verified and located prior to any excavation or boring. It shall be the responsibility of the Contractor to verify both horizontally and vertically the location of such existing utilities prior to any construction. Lot 2, Block A Excel Plaza Inst. No. 2010000010278, O.P.R.D.C.T. 16650 West Grove Dr Holdings LP j Inst. 201200062933, O.P.R.D.C.T. I S89059'00"E SD 8' Chain Link Fence - 12.5' TP & L/SWBT EASEMENT Vol. 81202, Pg. 777 & j Vol. 85040, Pg. 1311, D.R.D.C.T. SD Lot 1, Block A DRAINAGE & UTILITY EASEMENT Excel - Phase 2 Vol. 96064, Pg. 4820, D.R.D.C.T. 83242, Pg. 4530, D.R.D.C.T. Luzzatto Excel LLC 20' UTILITY EASEMENT Inst. 200900278131, O.P.R.D.C.T. - - Vol. 96064, Pg. 4820, D.R.D.C.T. Concrete y,A,,,,,,. _.... Headwall ;'i"RCP //72' C"p, s Concrete Pavement - 724.47 -M 0 tLM 8""ELM C LLM n tLM ��� _ __... -- SHRUBS _. --_ _ SD SD O GLrvI '-'-'"' lip— .. � � nF+ arva'wwv,iurv.>mw�.*ar�wv„..0„r„vav,,,..,nn,.�„a..nv„ ,vannmwm¢>..,..w„ar..n,,,,,,,,,rw..s,,,waw.�rwv.�✓we„iw,,,v.,,,,,,,�.r uwv„wr...�....,,.��eirarerimn..n.+.i..,,�:o..mvv.,arovrr�,.xa„bYL — . —• •• •_—•••••••.— . . - . . . — — — — — — — � -- — — .— uP - - y. -..-..-..-o- -. --..-..- �. .. ncre exp Found PK Nai erial Utili Li es n 6 Cro sar N Co t 1 I I I I - -- -1 I In tall: - °' - Rip Rap \ IIII I 1 I I ! I 2 8” 5• Concrete Pavement -L-L-�-I 1 ---- -1 - -1- - ------1-- - I - - - ----L- Ben s - - DRAINAGE EASEMENT --------------------------------------------------------------U L-------------- ----------------------- � Ld 0 • Vol. 97176, Pg. 4307, D.R.D.C.T. i \ \ ®+ r� 0 0: ---------------------------- \ _ o o � S �' ----- ----- --- ------------------------------I -I \ o.a Install I I \\ \� N 2ri�o'oo” E „� Install: �9, 45 Bends Install: 1-8" 22.5° Bend 1-8" 11.25° Bend Concrete Pavement Tract VI, Block B Sunbelt Business Park Vol. 80092, Pg. 808, D.R.D.C.T. / Install: Install: LInll: 7c.os' 30' DRAINAGE EASEMENT 1-8"x6" Tee co\ 1 I I / 1-8"x6" Te 8" Water "x6" Tee1-6" Valy 1-6" Valve I Vol. 77215, Pg. 2834, D.R.D.C,T. " Valve I I 1 -Fire yd. 1 -Fire Hyd. 1 I Q One Story I I 1-8Valve ave I II i I Finished Floor = 637.50 I I I I Ref. MEP Plans For I I Exact Size, Location, I I And Elevations Of I I Utilities At Buildings. I � I I 1 ,® Concrete u1 � A= 59.07'48" R = 150.00'5/ 8"SIR Tract 14, Block B / L = 139.09'�- Sunbelt Business Park ® I / Vol. 97176, Pg. 4307, D.R.D.C.T. I Instgdl: 4385 Sunbelt Dr LLC CL I /1 8 er Inst. No. 201 100217868, O.P.R.D.C.T. I Backflow Prevention For Finished Floor = 637.50 o a = 58441" Domestic and Fire Services YY ® I / R = 110.00' Shall Be Located Inside The Install: I L = 112.77' 25' DRAINAGE EASEMENT 1-8 1 I / "x6" Tee I / Vol. 97176, Pg. 4307, D.R.D.C.T. I Building. Reference MEP. 1-6" Valve 1 / I / o 1 -Fire H d Y I / 1-8" Valve I `RCP _ SID I Install: I L -- I 2-2" Meters -- --- II I & Services I ( (Domestic) Rirc ete Concrete Pavement Ra I - L-- _ N 00.01'00" E / \ Finished Floor = 637.50 "Fns- I el— ---------------- \\ \ \\ \ Install: vvvv vv v 8 Water 3 cos` M / N / 10' DRAINAGE & UTILITY EASE#ENT SSMH Vol. 83048, Pg. 1523, D R D!6.T. 61 1 \ \ — yl �» ``%72" r Pipe co \\\\\ \\\\��o/ SUNBELT DRIVEco \ \\ \\ \ 'App \} .�59�. / / 60' Public ROW, 37' Concrete Pavement \ \ o / Ex. 12"W 4 / Reinhard & Hannelore Kral Vol. 2000146, Pg. 3980, D.R.D.C.T. \ \ TBM: Square cut with "X" on top of curb inlet located on the north side of Sunbelt Drive approximately 100 feet west Of the southeast corner of the subject property. & Service (Irrigation) Elevation 631.59 TBM: Square found on the top east end of a concrete headwall located north of the north property line and 2 feet northwest of the northeast property corner of the subject property. Elevation 635.11 MISC. INFORMATION 2 Prior to beginning any construction or construction staking, it shall be the Contractor's responsibility to contact the civil engineer to insure that all parties are in possession of the most current set of construction documents. Install: 1-8"x6" Tee 1-6" Valve 1 -Fire Hyd. 1-8" Valve Install: 2-2" Meters � O� & Services •� (Domestic) X -D. 1-2" Meter Street Pavement. & Service (Irrigation) Connect To Exist. 5' Dia. Manhole. FL 6" In 619.5 FL Ex. 619.0± (Verify) 10' SANITARY SEWER EASEMENT 10' SANITARY SEWER EASEMENT inst. No. 201400013669 O.P.R.D.C.T. REVISION I DATE 6': / ! Install: \� 12 8" Valve Remove & Replace /\ \ /moi C / 37 Lin. Ft. Conc. / ! Street Pavement. \ < \ Install: 1-8" 22.5° Bend C / /Install: / 12"x8" Tee / 1-8” Valve / / Remove & Replace 37 Lin. Ft. Conc. /2"FIR, V , Street Pavement. DESCRIPTION Water Crossing No. 1 1"=30' Horz. 1"=5' Vert. RLK ENGINEERING, INC. I 1 I West Main Allen, Texas 75013 (972) 359-1733 Off (972) 359-1833 Fax Texas Registration No. 579 Water Crossing No. 2 1"=30' Horz. 1"=5' Vert. THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF RONNY KLINGBEIL, P.E. NO. 76831 ON JUNE 13, 2016. IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING. OR PERMIT PURPOSES. All materials and construction shall be in accordance with the Town of Addison Standard Specifications and Construction Standards, and Standard Specifications for Public Works Construction prepared by North Central Texas Council of Governments (Latest Revision). Existing utilities are shown schematically and are for the contractor's guidance only. The location and/or elevation of existing utilities as shown on these plans are based on records of the various utility companies, and, where possible, measurements taken in the field. The contractor must call the appropriate utility company at least 48 hours prior to any excavation to request exact field location of utilities. The contractor shall be responsible for protecting all existing improvements in the construction of this project. The contractor is responsible for repairs of damage to any existing improvements during construction. Repairs shall be equal to or better than condition prior to construction. All sewer lines shall be PVC SDR -35. All manhole rim grades must match finished grade in paved areas. Manholes constructed in landscape areas must have a final rim grade six inches (6") above final grade. All water pipe 4" and larger shall be Class 200 PVC DR 14 water pipe. All pipe over 12" shall be Class 150 DR 18 PVC water pipe, conforming to AWWA C900 standards. Contractor shall be responsible for maintaining trench safety requirements in accordance with the latest standards of O.S.H.A. or any other agency having jurisdiction for excavation and trenching procedures. Contractor shall provide and implement a trench safety plan complying with O.S.H.A. City Project #16-09 PRELIMINARY WATER & SEWER PLAN Tract 15, Block B, Sunbelt Business hark ADDISON, TEXAS DESIGNED BY: TECH REVIEW: DRAWING FILE: DRAWING SCALE: RLK Engineering RLK 16032 WS.dwg 1 "=30' DRAWN BY: PEER REVIEW. DRAWING DATE: PROJECT NUMBER: RLK Engineerini RLK 6-13-16 RLK: 16032 SHF.F..T: a N -- 6 a L o d 61. oL°t 6 6 d a 00o' W w� w0 0.) m W� OD !n N a �t C m 3 Q m o ° Lo Lv =X co it) n N _ o ° N o (0 in 630 o " 6 ” 00 co 630 630 O c O o a °0 6J0 N P, to 625 625 625 1 625 620 620 620 620 CL pCL M Ln° IN U) Q fA N Q _ D 00 X= W6 = X W W = X M = X 00 W00 ■ = to X W = X W W00 ! = X LD W J J LL U_ J J LL Lt. J LL. J J U_ U_ J J U_ U_ J LL J J U_ U_ J U_ J J L _ LG Water Crossing No. 1 1"=30' Horz. 1"=5' Vert. RLK ENGINEERING, INC. I 1 I West Main Allen, Texas 75013 (972) 359-1733 Off (972) 359-1833 Fax Texas Registration No. 579 Water Crossing No. 2 1"=30' Horz. 1"=5' Vert. THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF RONNY KLINGBEIL, P.E. NO. 76831 ON JUNE 13, 2016. IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING. OR PERMIT PURPOSES. All materials and construction shall be in accordance with the Town of Addison Standard Specifications and Construction Standards, and Standard Specifications for Public Works Construction prepared by North Central Texas Council of Governments (Latest Revision). Existing utilities are shown schematically and are for the contractor's guidance only. The location and/or elevation of existing utilities as shown on these plans are based on records of the various utility companies, and, where possible, measurements taken in the field. The contractor must call the appropriate utility company at least 48 hours prior to any excavation to request exact field location of utilities. The contractor shall be responsible for protecting all existing improvements in the construction of this project. The contractor is responsible for repairs of damage to any existing improvements during construction. Repairs shall be equal to or better than condition prior to construction. All sewer lines shall be PVC SDR -35. All manhole rim grades must match finished grade in paved areas. Manholes constructed in landscape areas must have a final rim grade six inches (6") above final grade. All water pipe 4" and larger shall be Class 200 PVC DR 14 water pipe. All pipe over 12" shall be Class 150 DR 18 PVC water pipe, conforming to AWWA C900 standards. Contractor shall be responsible for maintaining trench safety requirements in accordance with the latest standards of O.S.H.A. or any other agency having jurisdiction for excavation and trenching procedures. Contractor shall provide and implement a trench safety plan complying with O.S.H.A. City Project #16-09 PRELIMINARY WATER & SEWER PLAN Tract 15, Block B, Sunbelt Business hark ADDISON, TEXAS DESIGNED BY: TECH REVIEW: DRAWING FILE: DRAWING SCALE: RLK Engineering RLK 16032 WS.dwg 1 "=30' DRAWN BY: PEER REVIEW. DRAWING DATE: PROJECT NUMBER: RLK Engineerini RLK 6-13-16 RLK: 16032 SHF.F..T: