Mia, Sorry this took so long. The bid tab for our EST is attached. We have a lot of extras in the water tower, so I would not consider it to be a good representation of how much a 1.5MG elevated storage tank would typically cost. If you have any additional questions, please let me know. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Mia Dia [mailto:Mia.Dia@arlingtontx.gov] Sent: Tuesday, June 14, 2011 11:21 AM To: Clay Barnett Subject: Addison Water Tower Bid Tab Hello Clay, It was very nice talking to you on the phone earlier. I appreciate your time and assistance with this. Please if possible, provide me with the bid tab for the Addison Water Tower project this will help me compare the estimate that our Consultant developed (Total Capital Cost for a 2MG Composite Tank $5,539,570 include 10% contingency and 12% engineering services). Thank you, ~Mia Manal "Mia" Dia, E.I.T. Graduate Engineer City of Arlington Water Utilities 101 W. Abram Street|P.O. Box 90231, MS 01-0200|Arlington, TX 76004-3231 P: (817) 459-6646 |F: (817) 459-6626|mia.dia@arlingtontx.gov Please consider the environment before printing this message. This message contains confidential information and is intended only for the individual(s) named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error-free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard-copy version from the sender.