Hi Clay, Please see attached regarding Daseke residence. One is the latest sealed utility drawing with utility layout per City's comments, and the second is the contractor requesting a change to go back to original water connection to dead end line (please see below contractor's comment). I just wanted to make sure that you were aware of this contractor's change, and if this is something we can address when we go to the record drawings phase. Hope you are doing well. Regards, Ignacio Ignacio N. Herrera, P.E. Civil Engineer HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-217-6646 Fax 214-739-0095 www.halff.com ________________________________ From: Tom Braun [mailto:tbraun@verticon.us.com] Sent: Thursday, October 07, 2010 2:39 PM To: Herrera, Ignacio Cc: 'David Droese' Subject: RE: Contact information Importance: High Ignacio, Attached is a plan showing the existing water lines for this project. After talking with the engineering department, they have decided to approve my proposed new layout indicated. They also just want us to extend the existing water service line to the east and utilize this for the new irrigation meter. They have asked that you revised drawing C3.01 to reflect these changes. Please call me when you get this email so we can walk through the changes. Thanks, Tom Braun VertiCon Construction 6850 TPC Drive, Suite 210 McKinney, TX 75070 972-569-9416 469-742-0836 fax www.verticon.us.com ________________________________ From: Herrera, Ignacio [mailto:IHerrera@Halff.com] Sent: Thursday, September 30, 2010 11:29 AM To: 'tbraun@verticon.us.com' Subject: Contact information Ignacio N. Herrera, P.E. Civil Engineer HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-217-6646 Fax 214-739-0095 www.halff.com