Clay, Attached is a picture of the concrete the plumber installed at the sewer line connection. Is this acceptable?? Please advise. Tom Braun From: Clay Barnett [mailto:cbarnett@addisontx.gov] Sent: Friday, December 03, 2010 4:38 PM To: 'Tom@tkbraun.com' Subject: Inspection Report Tom, Attached is the inspection report. Dave mentioned that the only needed item was that the lateral connection should be embedded in concrete. If you have any questions, please let me know. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857