Here's a brief recap of what ARS will prepare as a result of our meeting today: ROADWAY ALIGNMENT The town will have their consultant send us their sketch of "smoothing" out the westbound thru lanes to remove a P.I. in the intersection as well as the eastbound taper back to existing. DRAINAGE DESIGN ARS will revise the ROW based on copy given to us at today's meeting. We will then determine the existing 3 - 36" RCP slope under Keller Springs, remove the headwalls and RCB's as currently shown and extend the 3 - 36" RCP's with a standard headwall within the corrected ROW line. We will calculate the slope of the new RCP and determine the CFS of both the existing and proposed to see if this will work. If they do ARS will propose that Dallas County and the Town of Addison get a slope easement, letter of permission to enter or construction easement to re-grade the existing swales to drain to this headwall. This will be presented first as an exhibit for comments and suggestions prior to revising the plans. Once these two issues have been resolved ARS will revise the plans accordingly and make a 98% submittal for review and comment. Thanks Bill William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited