Rob, I just got the mylars from Lee and will get these over to you tomorrow. If you want paper copies (half size) I'll have to get these to you later since it was my understanding we were only supplying mylars? Let me know. Thanks Bill William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited ________________________________ From: Rob Kouba [mailto:RKouba@HNTB.com] Sent: Tuesday, March 29, 2011 2:38 PM To: 'Bill Parsons' Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans Bill, Please provide an update on when you can drop off the signed and sealed mylars. ARS’s contract with the NTTA ends on Thursday, the 31st and they have requested the plans be turned in prior to this date. Also, please contact the County and Town of Addison to see how many paper copies they would like, if any. NTTA would like two ½ size paper copies in addition to mylars. Thanks, From: Bill Parsons [mailto:bparsons@arsengineers.com] Sent: Monday, March 14, 2011 3:22 PM To: Rob Kouba Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal'; 'Bill Parsons' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans I'll try and get these latest revisions made tomorrow and then get mylars plotted for you. I'll keep you posted. Thanks Bill William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited ________________________________ From: Rob Kouba [mailto:RKouba@HNTB.com] Sent: Monday, March 14, 2011 3:17 PM To: 'Bill Parsons' Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans Bill, No further comments from me. Please add to plans as you’ve described below. Looks like we are ready for final signed & sealed plans. Let me know your target date to deliver this package. Thanks, From: Bill Parsons [mailto:bparsons@arsengineers.com] Sent: Monday, March 14, 2011 3:05 PM To: Rob Kouba Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans Rob, The detail the city has is for the installation of a tree well with new trees ( I attached the PDF - located in the upper left hand corner) and this won't work for an existing tree. I'll add a note stating: TREE WELL TO BE INSTALLED PRIOR TO SIDEWALK INSTALLATION. SHOP DRAWINGS SHALL BE SUBMITTED AND APPROVED BEFORE ANY WORK COMMENCES ON THESE. THE TREE WELL GRATES MUST BE ADA COMPLIANT. THESE WILL NOT BE PAID FOR SEPARATELY BUT WILL BE CONSIDERED SUBSIDIARY TO THE UNIT COST OF CONCRETE SIDEWALK. Any comments before I add this? I'll get these revised and send over for you to look over. Bill William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited ________________________________ From: Rob Kouba [mailto:RKouba@HNTB.com] Sent: Monday, March 14, 2011 7:23 AM To: 'Bill Parsons' Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans If you can’t find standard or detail for tree well, please add note to install tree well at those locations, tree well shall be ADA compliant and shall have approval of engineer before installation. Thanks, From: Bill Parsons [mailto:bparsons@arsengineers.com] Sent: Monday, March 14, 2011 7:19 AM To: Rob Kouba Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal'; 'Bill Parsons' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans I'll add the notes as shown. As for the tree well let me see if there is any standard I can use? Not sure if we can relocate these since they are fairly large and probably extend under the parking lot pavement? comments? William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited ________________________________ From: Rob Kouba [mailto:RKouba@HNTB.com] Sent: Thursday, March 10, 2011 1:45 PM To: 'Bill Parsons' Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans Bill Please add note per your mark up to the signing sheet. Regarding ADA comment…to clarify, the two tree planters in question are not on the NE corner of the intersection, but are existing trees planters a couple hundred feet east of the intersection on the north side of Keller Springs Road. I remember talking about not disturbing the existing landscaping on the NE corner and not taking any ROW on this side. However, I don’t remember talking about these two trees. Two recommendations to gain ADA compliance around the trees that don’t require ROW would be add a tree grate or to relocate the trees outside the ROW. I would suggest add a tree grate. Is there any additional work (ie add standard, develop detail) to the plans other than a note? Make the tree grate subsidiary to various bid items. Let me know your thoughts. -Rob From: Bill Parsons [mailto:bparsons@arsengineers.com] Sent: Thursday, March 10, 2011 1:21 PM To: Rob Kouba Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal'; 'Bill Parsons' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans rib, Here is what I have marked up for reusing the existing post - let me know your thoughts. As for the ADA comment it was agreed upon during 65% review comments that we were just re building this corner as it is today and would not worry about it. If we have to then ROW becomes an issue which we all agreed we did not want to do on the north side of Keller Springs. Again let me know. Thanks Bill William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited ________________________________ From: Rob Kouba [mailto:RKouba@HNTB.com] Sent: Thursday, March 10, 2011 10:01 AM To: 'Bill Parsons' Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans Bill, I have reviewed the final Keller Springs Rd Intersection Ph. 21 plan sheets that you submitted for a quick verification. There was only one 100% review comment where I could not verify completion. See comment below. Sheet 14. EMP 14 MAINT 12 Sign 2 is mounted on a "P" post. The post can be unbolted from the foundation and relocated to a new foundation. Agree Will add note that existing post is "P" and sign and post to be relocated with new base/foundation SB I did not find this note in the plans. Please check. Also, there was several review comments dealing with ADA requirements regarding the sidewalk on the north side being located so close to the existing planters (Keller Springs between 8+00 & 9+00). You responded that you would discuss the issue with the Town and County. I did not see any changes to the sidewalk or planters in this submittal. Can you let me know your final thoughts on the planters and ADA compliance. Once these two issues are addressed, preparation of signed and sealed plans can begin. Thanks, Rob Kouba, P.E. Project Manager HNTB Corporation 5910 W. Plano Pkwy, Suite 200 Plano, TX 75093 Tel 972.628.3152 Fax 972.661.5614 www.hntb.com From: Bill Parsons [mailto:bparsons@arsengineers.com] Sent: Friday, February 18, 2011 10:52 AM To: Rob Kouba Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com; 'Bill Parsons'; 'Brad Eads'; 'Ram Gopal' Subject: RE: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans see below for my comments William A. Parsons, PE Project Manager ARS Engineers, Inc. 5910 North Central Expressway, Suite 1000 Dallas, Texas 75206 214-739-3152 Phone 214-739-3169 Fax This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited ________________________________ From: Rob Kouba [mailto:RKouba@HNTB.com] Sent: Friday, February 18, 2011 10:48 AM To: 'Bill Parsons' Cc: jmears@dallascounty.org; 'Clay Barnett'; 'Musa, Basel'; asandhu@arsengineers.com Subject: Keller Springs Rd Intersection Impr - Final Submittal/Sealed Plans Bill, I distributed your responses to the NTTA’s comments on the 100% submittal to the review team. No one on the review team has an issue with your responses and a resolution meeting in not needed. Please revise the plans per your responses and submit a paper set to me with a final cost estimate. I will verify that the plans reflect your responses. The verification set does not need to include standard drawings. If you could have the revised set of plans to me in two weeks (week ending March 4th), it would be appreciated. Let me know if you’re able to meet this deadline. I'll get someone on this early next week and keep you informed of our progress BUT we should be able to get these to you in a couple of weeks. Once I’ve verified the set of plans, you can produce a set of signed and sealed drawings. This needs to be done before the end of March when your contract with the NTTA expires. again after you have verifed our revisions it will just be final touchups and then plotting mylars. I will coordinate with John and Clay about specifications and other needs to complete a bid package. Just let me know so I can plan accordingly! Thanks Let me know if you have any questions Thanks Rob Kouba, P.E. Project Manager HNTB Corporation 5910 W. Plano Pkwy, Suite 200 Plano, TX 75093 Tel 972.628.3152 Fax 972.661.5614 www.hntb.com This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing or copying this e-mail is strictly prohibited. 㜠䁌㘰㽸礃㋼㐱㜭ⴹㄳ䅌轵䍨糲綏纟羯㚳䐹ﲠ硡iཋὌ⽍㽎住僿兟彯卿宏屏㹟支⦅齟꽠潂罃轄ཥ澔羆䟿䡟魯蜏裟觯诿谏?⾍羟侏徐澑佝⾚�芯莟钯ꂿ槐ᮬ쑩Ό羰Ἔ⼝㌞捡ㅫ୤⸷餵퇿样徼撩ⵥ튽僢郢熼�晠⃤놗ㅵ炶⋵퇵睾ヵヵ僢w焣ﵮ½앤떱볱빴뼠郢퇵쾺芩내뱬�℣클큷郡큷鹯싐ᅡ僳⅙냈僉恵℣䊿邴뷽潐Ⴞ邁僧쇂惟ꊾ搰ɷ탵ၧ鹉샐跏芩푹뻐亓呏旃샃睕挀灩뽩쑁嵒싂瞡瀁ꇤ�怞큷ሣタ炯ᵶミ돂ᅥ�Dž࿉Ꮚ뀢웯쌁웰쉱憱遬 䋈烑쳻즐旂臌䋑醺ᖼ俍꧷쑐犀䁬ꃠ芼揑볿쏂瀁姰옠ᄣ䁷奲炐콢胲퇌℣耣祰쓌龺뭿�뒡떀싐潠�抐녷ꅤꉟ뉯�ゥ誱࿟�㼐뾤쾥£ꟿ哯娟ꦟ塯곏マ뾩㾒侓쿯뾳쾴辗龘駿鵯鸿ﭏ￯￿쿝㾣濥翦迧鿨꿩뿪ۿ﫯ﮯO㿸俹忺༐忿ῼ⿽꼖ÿƿˏϟӯۿᬏࠟ謯+쿭ᅶ哖塅₵䇠䥌乇ꂵ惒䇀犼ย⠏๐꯰滠怎⟳ᗵ燛뉣൹ᔋ⋯゚弑漒缓輔鼕꼭୶輞⯟⏬㎠ₗ▊桿凕ꬩ⽩榀⽺㋑倨₾靤클怎㌥晼⬱儱〫屪扵拰%ﱾ张넾掯䌠ἢ缤៽㡌 �㽀佁ḍ⼅䶕⁰䥇ⵎ탈佔㍍⠕㍯䙿ﴟ䭢㻋䲡⺟⾿ハ竐액慁⺶⽤�鉏牢䁬㩭༝἞㽏ॗ㩎壿傯儿剏卟呯䱿ㅪ敱ꀾ졋扐㑡䟟孳펓ꭂ㪰扒䂣땈⹂嵭澭羮辯䷷乏桟卵䆿轖彚흡噧뽀眠䙒来쐀爠앹ㆰ瀸糰昰瞰㫡䏿持䜏떂敐曯棿椏㼟⽪ᖺ뀜ャ䈧撛펀偰ᇋ❳ア玟琏生瘯紿䏴督􃽸흡ㅪ稀䃡끮ꁺ䩋뻐痠傿⹹恋祧큟䌧쁊냅轰艇佂災킽셟䴧Ã罡郐ႇꂶႶ큟큊膼䁵䂿絧쩡旱羂彻潼罽轾齿㕫쁢僒콫⾂졡챋嵠摰ꬠ쾅艇�杂‱뱒뺠⡉똒�휀옱涰䃘⃼㈭홰폱轰 뷑䮲欯䮐즐傡쁊炶徐埿貯岏嵟は㇏㋟䳯_弗켜弜쾘�輟鼠꼡≿⎿䟏യ䭟ꀏ竏Ⲃꇿꋟꝯ꣏꧟ꫯ곿/ᾭ⾮㾯龶꾱켘�쾼돿됏딟똯뜿롏륟멯魿辻鮼홉�拑�￁ꋑ⁤䃒Àᅻƞꁤ燙탳巀哐쁁ꗐ麐攐ム烘႞Ɩ苎澓ꋈ숼鳏靰츖쵆皰鹩�浡븮뿟샯黺츠콠ၻꃎ᧓栠ナ邈鳿�튐퀀졏㲄㱐춀솈邈ዛ汯Ⴭ螏鑐�鳀湠瑯烝觽撠쿓�႘麿폰�젿킢瀢⊘鎀�闟퉀�죱翲ꃝ凎䄼ꇚヲ뎖ꂄ肜£鏈ž쵿��픿쳬㲀穐皡齿漂㱰킰추暰鳷邰촠⹝遷 㿐痈叭榜閰摒鹯蛝䋎れ჊�鳰衱情䂕牤㱡鑐￯↑෬냀懍减焾濰鏈�퉐黇潡냀�瑑칷睠ꂉ毪႞ﴨ⁂ꁫ⇝䶺情�聆졏㒢⾛틿쌀밉ơ鍁씱㲨ꒀ킥嬁�温ﶡ蘿�칢鐀郀椐뇩῞핿䳝懦쇦�麀�₟勍ˏ냍邈鱢캰罂�ꋈ틜ᇐ탘郌、⊌뼇켈輏鼐꼑뾛鰝䇏遮﹞佃ﱌ剏恞倌Ù�Ή꼔ቷᏟ雯✠ꅺ켌ꋈ뽧懦郊脎潬�䂌ٸﵑ�毂ꂉ貢昰쇊狍삔澌쵧麱䈐呕ㇽΏ졟玓끞阆同㼜伝ᓿ⁊킲칡⍑�蓱ᄀ郣ᇗ켥䏚勽㼏⼩ᓿꔿ꘏ㄟ븿 숟쌏쐟O㿅俆忇濈翉迊伛缴㗿⾏わ㖟㛟㟯㧿䐏뾯⼻㼼伽弾漿悧ﷰꃎ콉拓סּ쾪ꏸㄖ설畤텏ﯧⶥ☏槓豧�R뒗⇰脎拳㏎턆탲흿؁⏐﫡ﻄfiﻒ睴ᙀ區䯏췒董쾠輀ǯ菚蛎灸쵩ᄆ꼮༖἗⼘㼙会뼿㽂䏿摏政晏荟媃䬏䯒並ⱡ昒膕鏸鏺叭∤췿枀梯暿間黱ؐ﵂鉺蝪�ڠ⡤刀ﷰ鹰樐殟�탑刡��洃ၟ轝替㇟㋟磯䆿䕏䘿䝏⦅潈罉轊齋꽌뽍�サ緿眏砏紟繟罯聿貏O꾂뾃쾄�拌ϭ怬閏ﹰ䫤桯ℬ�䏑킔〢뀧턠߿�玤鍟�鼰❗ 懏鄬↘䀬楢鏹捀鉫࿰帯徏悟ᆵ뽡콢⾇꾉뾊徥澦羧櫻䫈醝䂕燌劷ⲡ挰怬튗≧︠稡ﵐꡰ꧟꣯礟ッ罺쾲�쾌�マྑ鋿錟鐯锿ꕏ똟褏녟?⾲澷羸边龺꾻뾼쾽빿뿟샯૿沯뒶≐焰��쉡쌟윯젟줯_俊忋濌翍迎鿏￘࿔쏿쒯�픯홯흿��ᆵ뿚쿛�ﯞ�翠濤￯�濯翰࿢ΰ쿰�￿댯㙧퀀傯盾⿺ἄ缆濸翹꼈�拺㬍੢຀鼏ꁏꅟů窢㈣㍥㌵쵡箣ꐹၯ勆ၯꮀ●눊❋戰剡倐︮噅뎰됟ုᮯཙᲪ柿꼑뼒섓楔ဤ낚깥᠀ಐ滰䈔喢骣㋾༗뼟ῼༀ Ἠ뼛尟ǿɟͯѿ֏ટடಯ徿ἦ缠輡꼓㺢孧秠ᛗ㐯㖏傓쁒驪匀ー�Ȳ偙聲邞�꼪弟㛿㜟∯⎏⒟㮯⛟⟏￟漿罀Ἤ⼭㼮彈弰ㇿ㉯㍿䞏兯䈿䏟䓯￿ཆ὇⽗翽迾⽞罌⽁埿壯㣿㤿㩈嶿䠯䦏゚꽊彡潢�oὒ叿启唿桏狿࿏ၟ摯뼿佥彦伹뼕轨驸ꍈ횰㵂畿䍣遷睰骐」佭彮潻἞徇ོώ⽾柿脿硏機汯泿薏觿゚뽯콰�ウཱུὶ⽷郿訯误跿缏㨯輟齯桻㤵鰱圠촚隬䍐솮ギ歐祷瀚졓極퉴㊐頰鑁⦅澕쾟�ᄁ뾎�釿鋯铿꬏陯霯頿饏⦅澚羛辜龝꾞쾻쾭�꽿ꏯ뇿섿㱏꧃ᩂ呰堆�ꎾ㔷 㤰S辶龷￁࿃ῄ佚彛潜쇿뎯뚿땏쳟쵟륯먏?⾻㾼侽徾澿翀忔뿎쿿쓏낿읿핯�式O㽠�￘࿚Ί⿜㿝��᾿쿦࿆ῇ⿩᛼敔୬俊ꏸ⸠㈶㌮/쿖࿰῱⿲㿳俴念濶憐犯ﮯﲿ﷏ﻟ迯￿༁ἂ圗慆͸ꇯㄶ㔮଴￟众弘漙俑忒濓6৿ଏடℯ⊿໏ཟၯソ輑鼒꼓뼔켕뼩ἤ⼥ᨿᬏᰟᴯ㤿㨏愚〠牨晥ꀷ2灴㨐⼯䉷⻠湨琰⹢❣㽰晼啩쀃㑤曲끄㵩琐笀奈䕐䱒顉䭎䈠䍯絲䑽ॡ끄獲ဴ捜ㅦ峼͵䃐䉈⿪〿⍉ﵟମⵡ⺟䮯㫟㬟☯マ鼧꼨�켪�⽎㽏ヿ ㄟ㈯圿㐟㕟㙯㝿マ⽖轐齑꽒뽓코�ۿޯ垿堿奏婟孯屿羏齝꽞软콠呰肧텰ﴯぅ瑶砿扟振搿汏/潦罧轨齩꽪往澁�滿狯珯諿炯煯轿甓゚꽶뽷콸佡꽽뽾콿辇臇苯㳿䌣畯怽倽葏薢蛏ϟ框葩斐ⵚ邘ͩ賐摰토빹䐠鮀蓀ᾐ陏瑒䀾㵝洐Ⴊ₪¡꩷栐₞Ⴊ킠⁂낗湯聄搜䍥㰰ꆑㆼ㘱鑉拠鹲峉䕬敀鏿ꀺꓣ䕡ꩀꀠꏰ颡浀삛ꅬ顁⁰炤掠䀽漠り쾡펢ㆪ䁅篻ꐡ痐ㆥꂛ徥ꛓꝯ瑽䥯桀…ኪꅳꑀ慒䝤蓠㶀摀⹾꾭뾮綧羲辳貧赉り鱹ꓰ乃呏쾪ꯇ꧙䈅挠灩遄ぃ굻ꨂ瀢倽䂘炛ꂤ楳魢꧀뗓 뙿鞏貧悧㵶湑ꩧ3疠澹펢산뾺쎻Ê྾뽻ꜟ抌ꊱꂬ↲ᆪ�イꊸ⃉䃁犻셥젱�䢠䁅忂䎖倽ꥲꃱ¬Ꮙ⊡憪俅忆࿀䂠䀽ꍵ湠ドꑩ캠ꤠ矡鏫䔐朱⃎셰ꕡ섐灃祰瓁䆠翋菌쫏蓥鮐㶐捠ꥴ튱﫰ꁯ戰ㆲ㾋侌�髿鮯蒿蔿鹏餯푍陿o뾎쾏콲뿘侑徒铿穿笿ソ迱鿲꿳뿴쿵�￸﨑朏㠵㇬潢멤㟞㇬싩ⶕȕŽp