Nancy, I hope you and yours had a great holiday. Did you have a chance to review my proposed update for the report? Thanks, sln Shannon L. Nave, P.E., CFM President Nave Engineering, Inc. Civil Engineers - Hydrologists Texas Registered Engineering Firm F-7457 P.O. Box 759, Weatherford, TX 76086 110 W. Josephine Ave., Weatherford, TX 76086 Off: 817-596-7575, Cell: 817-992-8031 e-mail Shannon@Nave-Eng.com Fax 817-887-3016 From: SLN Sent: Monday, December 20, 2010 10:41 AM To: 'Nancy Cline' Cc: Clay Barnett; 'Mathew Thomas' Subject: RE: Bankston Flood Study Comments Nancy, Can I add the following paragraph under existing “2.00 Hydrograph” paragraph and meet your request? “The weighted C values used include the proposed EMAS and run-up areas at the end of the runway and on the airport. Additionally, because the proposed project at Bankston Collision Center will not increase the impervious area the runoff will not be increased by the project. Thus, there will be no hydrologic impact between the Bankston project and Midway Road by the construction of the proposed Bankston project.” Thanks and Merry Christmas, sln Shannon L. Nave, P.E., CFM President Nave Engineering, Inc. Civil Engineers - Hydrologists Texas Registered Engineering Firm F-7457 P.O. Box 759, Weatherford, TX 76086 110 W. Josephine Ave., Weatherford, TX 76086 Off: 817-596-7575, Cell: 817-992-8031 e-mail Shannon@Nave-Eng.com Fax 817-887-3016 From: Nancy Cline [mailto:ncline@addisontx.gov] Sent: Monday, December 20, 2010 9:53 AM To: SLN Cc: Clay Barnett Subject: RE: Bankston Flood Study Comments Shannon, Please revise the study to : 1.) Analyze and indicate what impact if any there is to the properties downstream between Midway Road and Bankston and 2.) Include in the report the information that the EMAS and run-up areas are included in the drainage run-off analysis. Please let me know if you have any questions. Thank you, Nancy Cline From: SLN [mailto:shannon@nave-eng.com] Sent: Monday, November 29, 2010 8:29 AM To: Nancy Cline Cc: Mathew Thomas Subject: Bankston Flood Study Comments Nancy, You asked me to check in with you today on the Bankston Flood Study. Thanks, sln Shannon L. Nave, P.E., CFM President Nave Engineering, Inc. Civil Engineers - Hydrologists Texas Registered Engineering Firm F-7457 P.O. Box 759, Weatherford, TX 76086 110 W. Josephine Ave., Weatherford, TX 76086 Off: 817-596-7575, Cell: 817-992-8031 e-mail Shannon@Nave-Eng.com Fax 817-887-3016 ****************************************************************************************************************** This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you. *******************************************************************************************************************