Shannon, Please revise the study to : 1.) Analyze and indicate what impact if any there is to the properties downstream between Midway Road and Bankston and 2.) Include in the report the information that the EMAS and run-up areas are included in the drainage run-off analysis. Please let me know if you have any questions. Thank you, Nancy Cline From: SLN [mailto:shannon@nave-eng.com] Sent: Monday, November 29, 2010 8:29 AM To: Nancy Cline Cc: Mathew Thomas Subject: Bankston Flood Study Comments Nancy, You asked me to check in with you today on the Bankston Flood Study. Thanks, sln Shannon L. Nave, P.E., CFM President Nave Engineering, Inc. Civil Engineers - Hydrologists Texas Registered Engineering Firm F-7457 P.O. Box 759, Weatherford, TX 76086 110 W. Josephine Ave., Weatherford, TX 76086 Off: 817-596-7575, Cell: 817-992-8031 e-mail Shannon@Nave-Eng.com Fax 817-887-3016