Ryan, I am working on getting the amount of impervious cover required for an EMAS system. I will forward that as soon as it is available. Our Public Works Inspector is working on compiling the record drawings you requested. Since we do not have a GIS system, they must be compiled by hand, which is extremely labor intensive. Alternatively, these were give to Shannon Nave. Would it be possible to get them from them? We could then just supplement with the plans for Midway and Arapaho. I will respond to the previous email regarding the sensitivity analysis. If you have any additional questions, please let me know. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Ryan Plasse [mailto:rplasse@pkce.com] Sent: Monday, June 20, 2011 8:03 AM To: Nancy Cline; Skipwith, Walter; Clay Barnett Cc: Hong Chen; Ryan P. Mortensen; Ryan Plasse Subject: Revised Bankston Meeting Minutes All... Attached is the meeting minutes updated per comments. Also I'd like to follow up on our request for information regarding action items 1 through 3 of the meeting minutes. We need the impervious area Nancy mentioned and the as-built plans for the southern airport drainage system crossing Lindbergh Drive. We also need the as-built plans for Arapaho if our preliminary sensitivity analysis is not acceptable to the City (the sensitivity analysis, if accepted, would be fully documented in the report). Please let me know if you have any questions or would like to discuss further. Regards, D. Ryan Plasse, P.E., CFM Director of Water Resources 8350 N. Central Expwy, Suite 1000 Dallas, Texas 75206 -1612 P: 972.235.3031 | F: 972.235.9544