Claire, Please submit an RFI through the civil engineer for the project. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 P Please consider the environment before printing this email. -----Original Message----- From: Claire Callaham [mailto:ckcallaham@calhar.com] Sent: Friday, October 02, 2009 4:16 PM To: 'Preston Atchison'; 'Carson Coleman'; 'Johnathon Grammer'; 'Allen Braddock'; joseh@calhar.com; don@calhar.com; Jason Sutton; Gordon Robbins; Nancy Cline; David Wilde; Clay Barnett Subject: Methodist Hospital - Sojourn & Addison Rd Water Connection Status & City Request Importance: High Good Afternoon to All, Our foreman uncovered the existing 16” water main today at the 10” existing connection where we are to install a 16x10 cross at this same location. The existing main is 16” RCCP and the 16x10 existing connection is a 16” RCCP x 10” PVC Tap Saddle with 10” Valve. With this information, we request the City to provide in detail the connection materials & configuration now required at this location. Once confirmed, we will proceed with ordering the required materials. Thanks to all, Claire Callaham CalHar Construction, Inc. 2138 CalHar Drive Melissa, Texas 75454 Office: 972-838-2888 Fax: 972-838-2299 Mbl: 214-325-1879 E-Mail: ckcallaham@calhar.com