Please see below and let me know your thoughts. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 -----Original Message----- From: Andrew Rolph [mailto:arolph@ntexcon.com] Sent: Tuesday, February 09, 2010 2:08 PM To: Clay Barnett Subject: 4 - 4" UGT conduit item discrepency Clay, item 254 and item 261 are essentially the same since both items are 4 - 4" conduits with flow fill encasement for compaction. The original item for 254 was just for sand encasement of the pipe, not flowable fill. The 855 LF for item 254 needs to be moved to item 261 in order to capture the flow fill cost required per the preconstruction items discussed. Please advise if can include this change in CO#5. Thanks for your help, Andrew D. Rolph North Texas Contracting 4999 Keller Haslet Rd. Keller, TX 76248 (O) 817-430-9500 (F) 817-430-9207 (M) 817-819-0703