Zach, It would be helpful if I could get the excel file that goes with this. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Thursday, June 24, 2010 6:02 PM To: Clay Barnett Subject: Fw: Vitruvian - May Estimate Clay, The May estimate is finally correct. See Andrew's comments below and let me know when you would like to do the final-final-final walk on 1B. Thanks, ________________________________ From: Andrew Rolph To: Eric T. Little; zackf ; Nick Jacob Cc: bdunne@icon-engineers.com ; anord Sent: Thu Jun 24 16:35:51 2010 Subject: RE: Vitruvian - May Estimate Here you go. By the way, Metroplex will be onsite tomorrow to re-work all of the “bubbly striping”, we can expect signage to be installed early next week, Durable has re-adjusted banner arms/plumb poles and would like to request a pole walk (not the gay kind of pole walk, but a pole walk nonetheless…), Durable will have their pole paint touched up by early next too, pull boxes have been addressed, NTC is complete with our inlet rework, TOA logo storm lids should be ready on the 29th, cracks at Bella have been filled with epoxy, and foam under FH is cleaned and sealed. I believe the only hold up will be the 2 additional poles on order for the east end near Bella; Durable has reported a 2-3 week lead time for delivery from their supplier. One last thing, ForceCon is on board to finish their duct run starting next Tuesday or Wednesday at latest; this should just be a 2 day operation at most including cleanup. Thanks, Andrew D. Rolph North Texas Contracting 4999 Keller Haslet Rd. Keller, TX 76248 (O) 817-430-9500 (F) 817-430-9207 (M) 817-819-0703 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Thursday, June 24, 2010 4:57 PM To: Andrew Rolph; zackf; Nick Jacob Cc: bdunne@icon-engineers.com; anord Subject: RE: Vitruvian - May Estimate Andrew/Zach: Bruce and I just finished going through your pay app and offer the following COMMENTS BELOW: Basically, you need to change #123, 125, 244 and 272 to the contracted amount and then bill for the overage once the CO 7 is approved. Everything else except #269 is ok. On that one, change #269 to 1131lf (contracted) and 1086lf (installed to date). Call me if you have any questions. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Andrew Rolph [mailto:arolph@ntexcon.com] Sent: Wednesday, June 16, 2010 6:51 PM To: Eric T. Little; zackf; Nick Jacob Cc: bdunne@icon-engineers.com; anord Subject: RE: Vitruvian - May Estimate #22 – change billing quantity to $0 – moving to park package - Agreed and changed OK #34 – change billing quantity to $0 – moving to park package – This item was completed as shown on sheet 16 in our 1B contract AGREE #37 – change billing quantity to $0 – moving to park package - This item was completed as shown on sheet 16 in our 1B contract AGREE #59 – overbilled – should be 18,630sf – Change order 6 shows the quantity to be 19,321? I believe our quantities are right through the 25th of last month… Where is this new reduction coming from? AGREE YOU ARE CORRECT #117 – overbilled – should be 1,472lf – Agreed and changed to reflect CO #6 OK #123 – overbilled – this will be addressed in the next CO, but we can bill over without an approved CO right now. – Add to CO#7 AGREE, BUT WE CANNOT BILL FOR A CHANGE ORDER THAT IS NOT APPROVED YET. REMOVE OVERAGE FROM PAY APP – BILL ON FINAL INVOICE. #125 – overbilled – this was on my list last month too – we need to resolve this overage. – This is total amount of pipe installed and tested on this project (includes the RCB). Please add the overage to CO #7. AGREE, BUT WE CANNOT BILL FOR A CHANGE ORDER THAT IS NOT APPROVED YET. REMOVE OVERAGE FROM PAY APP – BILL ON FINAL INVOICE. #244 – see below – correct contract amount is 20 not 21 as I stated – There are 22 total foundations on the project, this is why we had to order the two extra SL Type 4 light poles. Please approve and add to CO #7. AGREE, BUT WE CANNOT BILL FOR A CHANGE ORDER THAT IS NOT APPROVED YET. REMOVE OVERAGE FROM PAY APP – BILL ON FINAL INVOICE. #251 – overbilled – you billed for 88ea, contract has 86ea – Agreed and changed..type-O in my favor? Ha. OK #261 – overbilled – should be 1,186lf – There is actually 1241 LF installed to date. I believe the difference can be found on sheet 79. ForceCon installed this 4T4 to station 23+45 before the sheet was revised to stop at 23+03. The other difference comes from calculating stations and in field verification. Please review the duct bank plans. Just FYI, I believe this quantity was originally so high to account for some 4T4 shown on sheets 50-51. AGREE #269 – overbilled – not sure how I missed this one last month, but you are over on the contract quantity and this duct bank is not complete yet (pending piers). – This is a quantity bust on the plans. I sent you an email back when Jennifer and I addressed this bust for reference. Basically, the installed plan quantity is 1404 minus the 375 LF taken out now for the cul-de-sac. This makes a new contract quantity of 1029 minus the 45 Lf yet to be installed leaves 984 LF installed to date. ACTUALLY THERE IS 273LF IN THE CUL-DE-SAC. CHANGE YOUR BILLING TO 1131LF – THE REST WILL BE ADDED TO PHASE 1C. #272 – overbilled – should be 1ea – One installed at station 13+75 and the other at station 18+60. This additional 2 way manhole needs to be added to CO#7. AGREE, BUT WE CANNOT BILL FOR A CHANGE ORDER THAT IS NOT APPROVED YET. REMOVE OVERAGE FROM PAY APP – BILL ON FINAL INVOICE. #273 – overbilled – should be 31ea – Agreed and changed per CO #6. OK Please review and let me know if any further changes need to be made to this application. Please remember that I have not yet adjusted the amount shown for the “paid to date”. Thanks, Andrew D. Rolph North Texas Contracting 4999 Keller Haslet Rd. Keller, TX 76248 (O) 817-430-9500 (F) 817-430-9207 (M) 817-819-0703 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Wednesday, June 16, 2010 9:46 AM To: arolph@ntexcon.com; Zach Fusilier (zfusilier@ntexcon.com); Nick Jacob Cc: bdunne@icon-engineers.com Subject: RE: Vitruvian - May Estimate Bruce found a couple more issues: #22 – change billing quantity to $0 – moving to park package #34 – change billing quantity to $0 – moving to park package #37 – change billing quantity to $0 – moving to park package #59 – overbilled – should be 18,630sf #117 – overbilled – should be 1,472lf #244 – see below – correct contract amount is 20 not 21 as I stated #251 – overbilled – you billed for 88ea, contract has 86ea #261 – overbilled – should be 1,186lf #272 – overbilled – should be 1ea #273 – overbilled – should be 31ea Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Eric T. Little Sent: Tuesday, June 15, 2010 4:21 PM To: arolph@ntexcon.com; Zach Fusilier (zfusilier@ntexcon.com); Nick Jacob Cc: bdunne@icon-engineers.com Subject: FW: Vitruvian - May Estimate Andrew: Have a couple issues with the following items: #123 – overbilled – this will be addressed in the next CO, but we can bill over without an approved CO right now. #125 – overbilled – this was on my list last month too – we need to resolve this overage. #244 – overbilled – you billed for 22ea, contract has 21ea #251 – overbilled – you billed for 88ea, contract has 86ea #269 – overbilled – not sure how I missed this one last month, but you are over on the contract quantity and this duct bank is not complete yet (pending piers). Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Andrew Rolph [mailto:arolph@ntexcon.com] Sent: Monday, June 14, 2010 7:39 PM To: Eric T. Little Cc: Nick Jacob; zackf; anord Subject: Vitruvian - May Estimate Eric, here is our May estimate for your review. The only thing that I still need to modify is the amount NTC has been paid to date, but this will at least get you started on reviewing the quantities. Thanks, Andrew D. Rolph North Texas Contracting 4999 Keller Haslet Rd. Keller, TX 76248 (O) 817-430-9500 (F) 817-430-9207 (M) 817-819-0703 뜙鰊곐紓➉⨉媌甲拶।ࡘ灣쐒틿�䝾弡㹟붑橢ᑈ埯꬚�㴜킼킅潒滢᭡㨸䘿騿�㹎쨸⚳秺ኾ⳦保츋䖤釙㖔姉玫隊鱮ﱏ賾礳㿇넺㳽엯཭鏝㑸㺹䧤䠺ᝉ厹獚꺲�牵�㩰玌䛫�ຼ㲮�ﻮ뫵쀗轟�᢮鮄剒⩛�騫⋓ꖨ悬�궐密懆議툶ඔ析든劊�笆㘁赫綷䭠㶿ඥඎᅱ廋쐩諑ꍳ荒溥鑐㩊ϵꕌ≘鹳褕捃鍼䢡눿銮襢캚펣�အ怂⽈垌█薧茚ꥃ�堳굅擾メ䙒簖抲繝湱뫦숴仏화캸ꆕ暹谆礄㭻⥘珄랲簝㖴䅼붛蜓賋룽❧끰뚗㿽뒗怳§ꗵꞩ鋰ସꇪ 恾醗䕥䊖孁ڳಅ귫舡痪탤�펍滄ឪ킧ᣡ琺⃤骒闸ꦃ珢㏰朾꤭銥轻낤ڑIJ쉭谱ޠ콁᢫鋶䮦踅쁇肛ᵗ臀䏿舌䤞飵밡鬄Ⴋ쁆肃㡧䶄ᬀ蘾ꇓᵣᯍ䓚⯑ﴁ킽瘤ﺌ䉰睕꒩跫峘⌬῁ⴖ쫙쪧佚ワॉ㈖ᶪ�䂕尥⃣飸॒�銥ﴆ뵍솴⼐咠ᡶ��₱�ﺴ᧷邏▯꽝Ⴅ굍븸屦ٔ띑〭們衬ꘐᥳ袸釅䧜쑘瀆ꛩ쀡奰錸⹅ᗤ誗깃툚硙￧ಿ᷀馃㿬ꥯ켹愐ﵠ鴸蚡쪋謌㠨ᓅ�뿔涉惤憓䬓⠽➼㑪뎒倽⏙⎅逴␹✲愭䑩楀㥀슸ⵄ懈⠃㽖牝配㽖䣿췽햞悸⸔곦 긠�ꔳퟃ슶훒嚲환ꎺ牔㛴�✆巓謊脍窂瓺뜷諾뚶綧ḳ⢺魧鴵ᙟ댕奴௒鞍鰯呯셞꒨熙ᎃ㒕洘牌鍪叜�ݢ커湟줴ນ攸稆膆㫝㼖谓搋⡙娩ꎏꛡ⾔쓔覔폿핪ⵓ똄醰覧ꂛ�ﺞಢ薴ꎩ彞㢩俲깃⪻㧤Ʈ廁뚧⯸查鷱풠䧸桶ᆃ㕵쩻⩏뵼ꪷ鞒듧돸ዐ⩜쪛遮学�찧ﵫὸ섹吷㑔埔➦쬬偏ⶀࣖ돲ꏳភ됮騏䏿ꝣﹾ⁡⺂䳱䒛誑瞟옉岡࿉⯇⺻ﲾ푾�뱟�闖욂ꪤꪤ待ኇሏ㊺㈥甿⃖읞幽엻�⽧먜肨ᗨ쎋闓௮槑췐줸챖┲ꅞ쨆쀟㛺 ᪫৩ꇮ⣇՘愚圗鶹뾕ꯩ鱏᧢닮侷应軜⾨㲭툙톚硇�כ㵶蹓巒웦臘듥桻躏︁䊩淇묿ή향໧ሶ卞璳籆癱翊ନ收柽㛄聾瀥ᝮ⧃ᵑꢔ頎ᵴ罌⸠錏ϡᑣ隫䍁肻᳹쏤확矲ຂ恭᫙൶꼺䎁喛❅1旞缣灢뜓ꬊ┷᭽㝃㭗脜炣劜뾧﵀蔅짼銢喪鏯輟汞뱮턑郰놈迠瀛娘⥺㶜턣ᥡ쌆븞좫ᡓ燵픬膜慓䐂ᩃ伽臍㩴貚ꇅ⏯┻낯惴軉瞯⮖ᘻⰷ⸗펓齉滆쾍骛욟ᯋ젾⭍덈䦏롬昁뽭儾ሎꗑ褮䯨컩֣ᱨ엂괙䟙誺ᑽ枽懍䟦䲸剟뇝犆箱韁 方享�岠븸ർ䄓纥ꎎ鏣찿䃾ѹ堒ﶨ㔟쮏퉾칈썵꩙濽饢ະ胸죛缐㬲⤵ㄼ袸䌶꾰츃垄땅楤亨뻻ꂗ冄稞쾔즎顛�脎龗⊿쩬⅗踼진殮麮憑糓渢곽﹫殱ោ逴꙽爠䖼蜹ぉ씺ۡ鞾ꥶ溢ࡘ郞࿉眺㻼栔⪬쉻恺봛죙ꍿ⋿આ뻲鸎榼切൯⽈鑿㧎纘饷﹂듛ﻹ桶싽吃窠ϑ筂ᗲ檟记㸊䶨鸌邓᠘炘몭墕♯䷿᳗﻽죔轨釉轍㜟홟ǽ鑻娆ⓚ㵕栦섮愔茏ↁ爚헴럳뭋ࠈヴﱛ䩪쑓팱�各꣢㔞箼శ皌伙젢뜍硸屗校䉛뷜䗧鹌眒姥䟵䭊㚈ᕭ붵�᮷꧅뜿슅녲 ᒬ䨢쯃费驡닿넬츘P弋톙ે湥獤牴慥੭湥潤橢㘊‶‰扯੪㐳㌷攊摮扯੪㜶〠漠橢㰊⼼楆瑬牥䘯慬整敄潣敤䰯湥瑧⁨㠶〠删㸾瑳敲浡砊嶜䇒荮ీ퀅ꜽ۠㶱䡡梤謦镖௚憐墨င謡뻞盾䗓㼗៊�⾝霯��㫻迧햲㣃毵쾹㖏流빚꧆ꥢㇻ뽯㻍귳꩛利宵뼾劗෫ꡥ珈靋�彍㪥ꔑビꪤ﵌䮿﨡휓秡✫ԏ婎礥㐨↨⡹社㉈鍪␼㔅༦ỉ䶵ሞ徠œ䮵ਞ窂ṍ܊鳔ᐼ樢㲟㴤䥪ਞ푇礡됨奚ࣱố뉃�ᆀ嘢ᬜ얰갘㘸荠報汱ᛀ嘄ᬜ塰汱裀旿뇅⌁곸䑀趫嚡潶ꪇ㙖 諈ͣ㠶嘜ᬜ 떰ᐱۇ셬앧Ʊ뺣鏔ꜞ꽅⑂ᎊ똃䪘✔谆⬸鱑း索ᘳ誽ᇃ觅嬁↌ᎊḇ筬殞䖂ﻂﵡ뫞꥛揳쭝��扒윝ﲩ⼲꩸哖ﰿ뻙ਗ湥獤牴慥੭湥潤橢㘊‸‰扯੪㜳ਸ਼湥潤橢ㄊ″‰扯੪㰼䈯獡䙥湯⽴偌䩄噒含ㅔ䌵ぴ⼰潆瑮敄捳楲瑰牯ㄠ′‰⽒潔湕捩摯⁥㜶〠删启灹⽥潆瑮⼊楆獲䍴慨⁲⼱慌瑳桃牡㌠⼸楗瑤獨⁛〵‷〵‷〵‷㔲‰㔲′〵‷㈲‶〵‷〵‷〵‷〵‷〵‷〳‶〵‷〵਷㈴‰㤴‸㤳‱㐵″㌳‵㜴‹㈲‹㈵‵㜴‱㘲‸〳″〳″ㄵ‷㐳‹㔴′㈵਷㈵‵㔴″㤷‹㠴‷㈲‹ ㈵‵㈵崵⼊湅潣楤杮㘠‹‰⽒畓瑢灹⽥牔敵祔数㸾攊摮扯੪㤶〠漠橢㰊⼼祔数䔯据摯湩⽧慂敳湅潣楤杮圯湩湁楳湅潣楤杮䐯晩敦敲据獥ਜ਼⼱ㅧ〰⼵ㅧ〰⼹ㅧ〰⼴㡧㌵术㔸⼶㥧㘳术⼳ㅧ〰⼷ㅧ〰⼸ㅧ〰⼶ㅧ㄰⼲ㅧ㄰⼰㡧㈸术〱㌱术〱ㄱ术㈶术㠲⼶㑧〰术〹术ㄴ⼰㉧㠵术㐳⼹㍧㐷术㌳⼶㡧㔵术㤸⼴㡧㔹术㜸术㤳⼶㑧㠴术㠳⼱㑧㜳术㔴⼵㍧㌷术〱⼰㍧㜶术㤳⼳㍧㘴㹝ਾ湥潤橢㜊‰‰扯੪㰼䘯汩整⽲汆瑡䑥捥摯⽥敌杮桴㜠‱‰㹒猾牴慥੭鱸鉝渽ッ䘌齷㝂꤈狊 Ђ퉜䌥ʋ׭餜㰎㙄朜鿋䎦枇菠퉅瓮㵾槗묋疏鼮薼ꩱ쫃立ᚱᜎ亾솵蘘沩즿⿖훴弯௟㤇揀纃첢�뺗�⯗䜷㨀⎎尵羇⯁⣳Β䃩⌒퀹败湀☵⁲ᨏ牛舠䳆쐎贗㤝겐黕ᲁᛈ牻讠⼚䃤꾶杀ڃ⁲᪏Კ곈⑱娇袔⿲ꤔ囕긨빨᪭뢡廉浆咛씐촕햷⢹梮궾ꄚꊸ⛹ᖫ瑗魟긫빨梩圔�獤ᗅ矝冯템굽뢳廉武긥뻨⻅秵穻몿먖跽祃⮬췗읶䕶撷ﲪ康볋啨騐꣌੆湥獤牴慥੭湥潤橢㜊‱‰扯੪㈳ਵ湥潤橢㤊〠漠橢㰊⼼慂敳潆瑮䨯䅄䙈⭌呔㔱瑅〰䘯湯䑴獥牣灩潴⁲‸ ‰⽒潔湕捩摯⁥〷〠删启灹⽥潆瑮⼊楆獲䍴慨⁲⼱慌瑳桃牡㈠⼹楗瑤獨⁛㘲‷㐳‷〵″ㄸ″㈲‶㤴‸㌶‰㤳‹ㄴ‸㔳‵㐲‶㌵‷㌵‸㌵‷㠶ਸ਼㜴‴㔶″㌴‰㜸‴㌵′㤴‵㜶‶〶‶㈴″㠴‸㔴‹㌵‷㤴‴㐲崶⼊湅潣楤杮㜠′‰⽒畓瑢灹⽥牔敵祔数㸾攊摮扯੪㈷〠漠橢㰊⼼祔数䔯据摯湩⽧慂敳湅潣楤杮圯湩湁楳湅潣楤杮䐯晩敦敲据獥ਜ਼⼱㑧⼷㑧〱术㠲⼶㍧㌷术⼳㥧ㄵ术㐲术〴⼰㉧㈷术㤳⼶㍧㤴术㤳⼳㍧ㄸ术㜳⼴㡧⼹㑧㔵术〱⼴㡧㘷术㠶术㜸术〱⼰㝧⼵㑧 术㈶术㠲术㔴⼴㉧㈸术㔲⼸㍧㜶㹝ਾ湥潤橢ㄊ‱‰扯੪㰼䈯獡䙥湯⽴䉁䅙剃䠫汥敶楴慣䘯湯䑴獥牣灩潴⁲〱〠删启灹⽥潆瑮⼊楆獲䍴慨⁲㈳䰯獡䍴慨⁲〹圯摩桴孳㈊㠷〠㌠㔵㔠㘵〠㠠㤸㘠㜶ㄠㄹ㌠㌳㌠㌳〠〠㈠㠷㌠㌳㈠㠷㈠㠷㔊㘵㔠㘵㔠㘵㔠㘵㔠㘵㔠㘵㔠㘵㔠㘵㔠㘵㔠㘵〠〠〠〠〠〠ㄊ㄰‵㘶‷㘶‷㈷′㈷′㘶‷ㄶ‱㜷‸㈷′㜲‸〵‰㘶‷㔵‶㌸″㈷′㜷ਸ㘶‷㜷‸㈷′㘶‷ㄶ‱㈷′㘶‷㐹‴㘶‷㘶‷ㄶ崱⼊湅潣楤杮圯湩湁楳湅潣楤杮匯扵祴数启灹 ㅥ㸾攊摮扯੪㈱〠漠橢㰊⼼祔数䘯湯䑴獥牣灩潴⽲潆瑮慎敭䰯䑐削⭖呔㔱瑃〰䘯湯䉴潂學‰ㄭ㠷㜠㘲㜠㌴⽝汆条⁳਴䄯捳湥⁴㤶ਲ䌯灡效杩瑨㘠㈹⼊敄捳湥⁴ㄭ㠷⼊瑉污捩湁汧⁥ਰ匯整噭ㄠ㠰⼊楍獳湩坧摩桴㔠㘰⼊潆瑮楆敬′ㄶ〠删㸾攊摮扯੪‸‰扯੪㰼启灹⽥潆瑮敄捳楲瑰牯䘯湯乴浡⽥䑊䡁䱆含ㅔ䔵ぴ⼰潆瑮䉂硯せⴠ㜱‷〸‵㈷崶䘯慬獧㐠⼊獁散瑮㜠㘲⼊慃䡰楥桧⁴㈷ਸ਼䐯獥散瑮ⴠ㜱਷䤯慴楬䅣杮敬〠⼊瑓浥⁖㈱ਰ䴯獩楳杮楗瑤⁨〵ਸ਼䘯湯䙴汩㉥ 㘠″‰㹒ਾ湥潤橢ㄊ‰‰扯੪㰼启灹⽥潆瑮敄捳楲瑰牯䘯湯乴浡⽥䉁䅙剃䠫汥敶楴慣䘯湯䉴潂學㠭ⴠㄲ′㔹‱㐷崱䘯慬獧㐠⼊獁散瑮㜠ㄴ⼊慃䡰楥桧⁴㐷਱䐯獥散瑮ⴠㄲਲ䤯慴楬䅣杮敬〠⼊瑓浥⁖㐱ਲ䴯獩楳杮楗瑤⁨㜲ਸ䌯慨卲瑥⼨睴⽯⽌⽁⽘桴敲⽥⽍⽂⽙潦牵丯䌯愯⽴⽚楦敶伯䐯猯硩倯䔯猯癥湥儯䘯支杩瑨刯䜯港湩⽥⽓⽈⽔⽉⽕⽊⽖⽋畱瑯獥湩汧⽥⽗慰敲汮晥⽴慰敲牮杩瑨猯慰散振浯慭栯灹敨⽮畱瑯摥汢瀯牥潩⽤畮扭牥楳湧猯慬桳稯牥⽯数捲湥⽴ 湯⽥浡数獲湡⥤䘯湯䙴汩㍥㘠‵‰㹒ਾ湥潤橢㈊〠漠橢㰊⼼牐摯捵牥䜨䱐䜠潨瑳捳楲瑰㠠ㄮ⤵⼊牃慥楴湯慄整䐨㈺㄰〰㈶ㄴㄷ㐸⤱⼊潍䑤瑡⡥㩄〲〱㘰㐲㜱㠱ㄴ਩启瑩敬嘨瑩畲楶湡ⴠ䴠奁㈠㄰‰畱湡楴楴獥砮獬⥸⼊牃慥潴⡲卐牣灩㕴搮汬嘠牥楳湯㔠㈮㈮਩䄯瑵潨⡲獕牥㸩放摮扯੪牸晥《㜠ਲ਼〰〰〰〰〰㘠㔵㔳映ਠ〰〰㈰㌸㜴〠〰〰渠ਠ〰〰㔰㜹㜶〠〰〰渠ਠ〰〰㈰㈸㐱〠〰〰渠ਠ〰〰㈰㔶㘸〠〰〰渠ਠ〰〰〰〰㔱〠〰〰渠ਠ〰〰〰㔲㐳〠〰〰渠ਠ〰 〰㈰㌸㔹〠〰〰渠ਠ〰〰㔰ㄹ㐴〠〰〰渠ਠ〰〰㔰〸ㄸ〠〰〰渠ਠ〰〰㔰㌹㔴〠〰〰渠ਠ〰〰㔰㔸ㄷ〠〰〰渠ਠ〰〰㔰㤸㈴〠〰〰渠ਠ〰〰㔰〷㔷〠〰〰渠ਠ〰〰㈰㐸㘳〠〰〰渠ਠ〰〰㈰㐸㘶〠〰〰渠ਠ〰〰㈰㜶㜴〠〰〰渠ਠ〰〰〰㔲㐵〠〰〰渠ਠ〰〰〰㘵㜲〠〰〰渠ਠ〰〰㈰㔸㠱〠〰〰渠ਠ〰〰㈰㔸㠴〠〰〰渠ਠ〰〰㈰㤶〱〠〰〰渠ਠ〰〰〰㘵㠴〠〰〰渠ਠ〰〰〰㈸〵〠〰〰渠ਠ〰〰㈰㔸ㄹ〠〰〰渠ਠ〰〰㈰㘸ㄲ〠〰〰渠ਠ〰〰㈰〷㌷〠〰〰渠ਠ 〰〰〰㈸ㄷ〠〰〰渠ਠ〰〰㄰㘰㜲〠〰〰渠ਠ〰〰㈰㘸㐶〠〰〰渠ਠ〰〰㈰㘸㐹〠〰〰渠ਠ〰〰㈰㈷㘳〠〰〰渠ਠ〰〰㄰㘰㠴〠〰〰渠ਠ〰〰㄰〳㘶〠〰〰渠ਠ〰〰㈰㜸㜳〠〰〰渠ਠ〰〰㈰㜸㜶〠〰〰渠ਠ〰〰㈰㌷㤹〠〰〰渠ਠ〰〰㄰〳㜸〠〰〰渠ਠ〰〰㄰㘵㜶〠〰〰渠ਠ〰〰㈰㠸〱〠〰〰渠ਠ〰〰㈰㠸〴〠〰〰渠ਠ〰〰㈰㔷㈶〠〰〰渠ਠ〰〰㄰㘵㠸〠〰〰渠ਠ〰〰㄰ㄸ㈸〠〰〰渠ਠ〰〰㈰㠸㌸〠〰〰渠ਠ〰〰㈰㤸㌱〠〰〰渠ਠ〰〰㈰㜷㔲〠〰〰渠 ਠ〰〰㄰㈸㌰〠〰〰渠ਠ〰〰㈰〱ㄴ〠〰〰渠ਠ〰〰㈰㤸㘵〠〰〰渠ਠ〰〰㈰㤸㘸〠〰〰渠ਠ〰〰㈰㠷㠸〠〰〰渠ਠ〰〰㈰〱㈶〠〰〰渠ਠ〰〰㈰㐴㐶〠〰〰渠ਠ〰〰㈰〹㤲〠〰〰渠ਠ〰〰㈰〹㤵〠〰〰渠ਠ〰〰㈰〸ㄵ〠〰〰渠ਠ〰〰㈰㐴㔸〠〰〰渠ਠ〰〰㈰㔶㔶〠〰〰渠ਠ〰〰㈰ㄹ㈰〠〰〰渠ਠ〰〰㈰ㄹ㈳〠〰〰渠ਠ〰〰㈰ㄹ㐸〠〰〰渠ਠ〰〰㐰〳㠰〠〰〰渠ਠ〰〰㐰〳〳〠〰〰渠ਠ〰〰㔰〳㜰〠〰〰渠ਠ〰〰㔰〳㠲〠〰〰渠ਠ〰〰㔰㔶㜸〠〰〰 渠ਠ〰〰㔰㘶㠰〠〰〰渠ਠ〰〰㔰〷㔵〠〰〰渠ਠ〰〰㔰㌷〹〠〰〰渠ਠ〰〰㔰㘷㔶〠〰〰渠ਠ〰〰㔰〸ㄶ〠〰〰渠ਠ〰〰㔰㌸㠵〠〰〰渠ਠ牴楡敬ੲ㰼⼠楓敺㜠″刯潯⁴‱‰⁒䤯普′‰੒䤯⁄⡛ை襱⸧�ʨ惨ᡶ涵⠩ை襱⸧�ʨ惨ᡶ涵崩㸊ਾ瑳牡硴敲੦㤵㜹ਲ┥佅੆