Bruce, Please verify that this information is correct. If it is then we will need to meet with them because we are legally obligated to pay them. If so, please let me know so that we can set up a meeting on a Thursday following the other meeting. The meeting will need to be held at the service center. Forcecon will be required to be there. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Andy Nord [mailto:andy@ntexcon.com] Sent: Tuesday, December 07, 2010 3:58 PM To: Clay Barnett Cc: 'Zach Fusilier' Subject: Vitruvian 1B - Duct Bank Quantity Verification Clay During our final project quantity sweep, we found a run of 4E6 duct bank that wasn’t paid. I think that this quantity might have gotten over looked in all of the changes that were being made by Icon during the project. The section that we feel was missed are the laterals coming out of the manhole located at STA 3+77.67 on plan sheet 81. These laterals add up to 50’ of 4E6 duct bank. NTC / ForceCon is asking that the city take a look at this over-sight and correct it. Thanks and let me know if you need anything else for me or would like to set up a meeting to look at this stuff in more detail Andy Andrew D. Nord North Texas Contracting | Estimator 4999 Keller Haslet Rd. Keller, TX 76248 Phone: 817.430.9500 Fax: 817.430.9207 Cell: 817.819.4117