Clay, I just wanted to let you know that I found a valve about 60’ to the west of the proposed bore under Spring Valley. I was trying to get an approximate depth of the main prior to pricing the potholing. When I popped the top, I discovered the stack was full of compacted dirt. I believe this valve is a lateral line teed off the main to feed the back end of the Clipper Pointe Apartments so you may want to have a crew clean this out ASAP. For pricing the pothole in Spring Valley, is Icon going to be responsible for survey upon excavating? Did you want to have a minimum saw cut area or a full panel replacement scenario (panel is 22’x10’)? Also, are we planning to do a temporary asphalt patch detail to repair the road, or concrete? Do we need to submit a traffic control plan for this as well? Thanks, Andrew D. Rolph North Texas Contracting 4999 Keller Haslet Rd. Keller, TX 76248 (O) 817-430-9500 (F) 817-430-9207 (M) 817-819-0703