The manhole is already delivered to the site. Wouldn’t it be easier to direct Pacheco Koch to have their contractor relay their sewer line ( + or – 200’) since we gave them the revised depth of the manhole prior to the start of their construction? It shouldn’t be our problem. ________________________________ From: Clay Barnett [mailto:cbarnett@addisontx.gov] Sent: Friday, April 23, 2010 3:45 PM To: Bruce Dunne Cc: Joel Massey Subject: Sewer Line Bruce, DISD has already constructed the sewer line to where is connects to the city main, so we are going to need to add an external drop manhole to our plans. I think we have to increase the diameter when we have a drop as well. Why they chose to install the sewer when they can’t go vertical due to lack of water is beyond me, but anyway here we are. Please change the plans and modify the change order. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 ****************************************************************************************************************** This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you. *******************************************************************************************************************