Attached is the revised price from NTC for the subsurface drain system per the revised trench detail from the Town. I will incorporate into Change Order # 6. I am just waiting for potholing results so design can be finalized and quantities determined and then will complete CO 6. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711