Bruce, I reviewed the sanitary sewer extension for Vitruvian Way and had a few comments: 1. At STA 23+05 specify that the line is to be plugged in Phase 1 and in Phase 4 – “Remove Existing 8” Plug and Connect to Ex. 8” Sanitary Sewer.” 2. Add the missing rim elevations for the manholes located at STA 26+35.89 and 29+71.89. 3. Add 9 lf of cement stabilized sand each side of the future and existing water crossings and 18 lf of ductile iron encasement over the 16” water line in accordance with TCEQ requirements. Also, do you know when I could expect to receive a copy of Change Order 6? Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857