Clay, These photos were taken Saturday after the snow and rain. The first inlet protector trapped sediment and leaves as projected. The 2nd inlet protector is at the bottom of the hill and it clogged with sediment. The contractor needs to check this inlet daily and keep it swept out. I spoke with the project manager and told him to pump out the water and shovel out the mud so it will continue filtering or to pull off the filter so it will drain. This inlet is not connected to the storm drain system yet. The picture shows how much sediment would have entered the drain if our filter was not there. Thank you. John T. Lee Inlet Protection Services Distribution Manager 972/330-1518 Cell john@inletprotectionservices.com www.inletprotectionservices.com