Clay, Please see the attached corrections to the June pay app for 1B. Bruce, Per our meeting with Clay today, the following items need to be corrected on CO 7 ASAP: Delete #65 - 6” Topsoil from 1B contract Delete #96 – 7’ Type B Manhole from 1B contract #244 – Change Plan Quantity to 21 to account for shaft added in CO #3. Keep the Revised Quantity the same at 22. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com