Zach, Attached is a letter regarding the Project Final for Vitruvian Park Public Infrastructure, Phase 1B. The letter assumes that the following items that were in progress during the walkthrough will be completed today: 1. Epoxy cracks at Bella crosswalks, 2. Remove foam from under fire hydrant at station 6+53 and install backer rod and NP1 sealant, 3. Tighten pull box lids on traffic control boxes through out project, 4. Fix irrigation between Mini Park and curb inlet at Marsh Lane. If you have any questions, please feel free to contact me. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857