Dear Projectmates user: This is a reminder for RFI # 13 . The text of the original item appears below. === RFI # 13 ===================================================== PROJECT NAME: Vitruvian Infrastructure Phase 1B DATE SUBMITTED: 6/22/2009 DATE REQUESTED BY: 6/25/2009 SPECIFICATION SECTION: 2 - Sitework SUBJECT: Asphalt Connector road (permanent) QUESTION: The permanent asphalt connector road as shown on sheet 7 of the phasing plan and sheet 24 of the paving plan shows to have 6" of lime stabilized under 4" of flexible base. With this being such a small area (298 SY), could we use flexible base in lou of lime stabilized if proctors and densities are taken? Please advise if this would be acceptable for this particular asphalt connector road. -------------------------------------------------------------------------- PROPOSED SOLUTION: NTC proposed to use flexible base in lou of lime stabilized for the asphalt connector road by the Garden Oak Apartments. To respond to the RFI, visit http://udr.projectmates.com, login for the project and then click on the "Const Mgmt" icon. To view this and other items, login to your project at http://udr.projectmates.com ***************************************** Projectmates Collaboration Server Blueprint for e-Management. *****************************************