Dear Projectmates user: This is a reminder for RFI # 17 . The text of the original item appears below. === RFI # 17 ===================================================== PROJECT NAME: Vitruvian Infrastructure Phase 1B DATE SUBMITTED: 6/29/2009 DATE REQUESTED BY: 7/2/2009 4 SPECIFICATION SECTION: 2 - Sitework SUBJECT: Bury depth of FH at 1+25 QUESTION: The typical fire hydrant installation detail shown on sheet 62 calls out for a maximum hydrant bury depth of 5'. Due to the conflicting grade of the existing 6" HP gas main, the thrust block would end up right on the gas main. -------------------------------------------------------------------------- PROPOSED SOLUTION: NTC proposes to lower the bury depth down 2' to all the room needed to pour a thrust block and not affect the gas main. No additional cost will be incurred to the Town of Addison for this additional hydrant bury depth. I have attached pictures for your reference. To respond to the RFI, visit http://udr.projectmates.com, login for the project and then click on the "Const Mgmt" icon. To view this and other items, login to your project at http://udr.projectmates.com ***************************************** Projectmates Collaboration Server Blueprint for e-Management. *****************************************