Response to RFI No. 13 As of 25-Jun-2009 4:02 PM CT Vitruvian Infrastructure Phase 1B 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308B Status: Outstanding Overdue Subject Asphalt Connector road (permanent) Reason Code None Question The permanent asphalt connector road as shown on sheet 7 of the phasing plan and sheet 24 of the paving plan shows to have 6" of lime stabilized under 4" of flexible base. With this being such a small area (298 SY), could we use flexible base in lou of lime stabilized if proctors and densities are taken? Please advise if this would be acceptable for this particular asphalt connector road. Proposed Solution NTC proposed to use flexible base in lou of lime stabilized for the asphalt connector road by the Garden Oak Apartments. Attached Files (none) Section: 2 - Sitework Int. Tracking #: Days Elapsed: 3 From: Andrew Rolph Originated: 22-Jun-2009 4:52 PM CT To: Jennifer Haynes, PE (First Recipient) Requested By: 25-Jun-2009 12:00 AM CT (Original 25-Jun-2009 4:43 PM CT) Copy to: Andy Nord Joel Massey Nick Jacob Jennifer Haynes, PE Wade Geistweidt Bruce Dunne Craig Benkdorfen Clay Barnett Additional Info Proposed Solution Impact Critical Path? No Cost Change: None Time Change: None Discipline Code: Civil Drawing Numbers: 24 Needs Drawing Change? No History (Chronological Order) Type Routed Billable n/a Memo Attached Files (none) From: Jennifer Haynes, PE Sent: 23-Jun-2009 8:22 AM CT To: Joel Massey Requested By: 25-Jun-2009 4:43 PM CT Copy to: Andrew Rolph Andy Nord Nick Jacob Bruce Dunne Clay Barnett Type Response Billable n/a Memo We have no problem with the substitution of a minimum additional 4" of Flexible Base for the 6" lime stabilized subgrade designated for the 298 SY connector road south of Ponte Ave Station 18+50. Attached Files (none) From: Joel Massey Sent: 25-Jun-2009 4:02 PM CT To: Jennifer Haynes, PE Requested By: 25-Jun-2009 12:00 AM CT Copy to: Andrew Rolph Andy Nord Nick Jacob Jennifer Haynes, PE Bruce Dunne Clay Barnett Final Response (Closing) This item is still open. No final response to display. .................................................................................. Copyright (c) 1999-2009, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - Blueprint for e-Management