Dan,
I sent the attached email to Ben yesterday.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Dan Covington [mailto:DCovington@tysonbuilding.com]
Sent: Friday, April 01, 2011 4:50 PM
To: Clay Barnett; Ben White
Subject: RE: Turbine Air Drainage
In reviewing the installation of the area drain, we found that the inlet was more than three inches higher than it should have been.
We lowered the elevation to where it should drain as designed.
One small area south of the inlet continues to hold a small amount of water when we irrigate the grass.
We plant to correct that situation on Monday, April 4. It can be done by hand grading.
When you can, please go by and give us your thoughts on the present situation.
There is a chance for rain on Monday. It would be good timing.
Thanks,
Dan Covington
Tyson Building Corp.
________________________________
From: Clay Barnett [mailto:cbarnett@addisontx.gov]
Sent: Wednesday, March 23, 2011 8:49 AM
To: Ben White
Cc: shomeyer@homeyer-engineering.com; wittplumbing@att.net; Pat Cannon; Dan Covington
Subject: RE: Turbine Air Drainage
Ben,
I received your voice mail on Monday. We visited the site on Tuesday morning and it appears that there is still a significant amount of ponding in the area around the inlet. This will
need to be addressed prior to issuance of a final CO.
If you have any questions, please let me know.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Dan Covington [mailto:DCovington@tysonbuilding.com]
Sent: Thursday, March 10, 2011 4:38 PM
To: Pat Cannon
Cc: Clay Barnett; Ben White; shomeyer@homeyer-engineering.com; wittplumbing@att.net; Ben White
Subject: Turbine Air Drainage
03/10/11
Pat,
There seem to be some issues that need to be resolved before we can obtain a C. O. for your facility:
1. Was the drain pipe installed according to plans?
2. Was the drainage system approved as drawn?
3. Will the system accomplish its goal?
I spoke with Clay Barnett, Town Engineer, for Addison today. He would like to perform a test to see if the system works.
He will call Tyson, either me or Ben, to let us know when the test will be performed.
I spoke to Michael Witt, the plumber who installed the system about being present for the test. He agreed.
I spoke to Steve Homeyer, the engineer who designed the system about being present for the test. He agreed also.
We will let everyone know when the test will be scheduled.
I am copying everyone involved in this project so I would like to say that this system was not on the original plans.
You agreed to pay the cost to install it. That was in January. Here it is March and still no resolution. I hope that everyone puts ( and keeps) this on their front burners as you
are essentially dead in the water until you receive the Certificate of Occupancy.
Thanks,
Dan Covington
******************************************************************************************************************
This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or
other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited
without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of
federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you.
*******************************************************************************************************************