Per our discussion at last weeks’ weekly park meeting, I called Victor Lissiak to verify the response that was written to an email from Rick Burgett with Rebcon on November 17th. Victor confirmed that the pier steel is not to be epoxy coated. Victor referenced Note 2 under concrete reinforcement on Sheet SP 100 that states that all reinforcing steel in the lake edge wall, weirs, pedestrian bridge and grotto are to be epoxy coated. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711