Attached is the chart that TCEQ uses to determine the maximum amount of evaporation. It goes back to 1940. They are basing our projected evaporation on the 1956 year evaporation level. This is basically used to determine the well size that would be needed to replenish the creek. We are still pursuing a small well that we could use instead of “treated” city water. I will update you when I have more data on the size and cost of the well that would be required. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711