Eric,
Can you post these into Project Mates for the Olden wall submittals.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Bill Campbell [mailto:owcampbell@kleinfelder.com]
Sent: Thursday, June 24, 2010 6:03 PM
To: Clay Barnett
Cc: Marc Miller; Noel Janacek; Wade Geistweidt
Subject: Fwd: Re: Vitruvian Park Soil Nail reviews (Kleinfelder comments)
Clay-
We have reviewed Olden's submittal and have the following comments:
Bill Campbell, Jr., P.E.
N. Texas/Oklahoma Business Unit Leader
2035 Central Circle #110
McKinney, TX 75069
o| 972.562.4677
c| 214.837.4476
f| 972.542.4366
>>> Noel Janacek 6/24/2010 5:41 PM >>>
We have reviewed the Olden submittal dated May 17, 2010 and have the following recommendations:
1. The submittal states that the design is based on Geotel Engineering, Inc.'s report no. E08-130 dated March 6, 2008. A subsequent report E10-129 dated April 22, 2010 should be reviewed
by Olden to verify their design is still valid.
2. Test results from the load testing described in the submittal should be observed and reviewed on behalf of the Town of Addison by a qualified Geotechnical Engineer registered in
the State of Texas.
3. No wall drainage is shown in the submittal. Olden should confirm that hydrostatic pressures were used in design, or adequate drainage should be provided to prevent hydrostatic pressure
from building up behind the wall.
We assume that the CM team will evaluate the geometry of the walls relative to the project plans.
As long as Olden has checked item 1 above, nail installation can proceed up to but not including shotcrete. The other two items need to be addressed prior to shotcreteing.
Regards,
Noel
Noel W. Janacek, PE
Consulting Engineer
7805 Mesquite Bend, Suite 100
Irving, Texas 75063
o | 972.868.5900
d | 972.868.5931
f | 972.409.0008
m | 817.846.3600
>>> Wade Geistweidt 6/23/2010 5:02 PM >>>
Gentleman,
I have spoken with Mr. Clay Barnett with The town of Addison about helping review the construction submittals from Craig Olden Construction. Mr. Barnett said he would be ok with Kleinfelder
helping with this task. The submittals are loaded on the projectmates site for the project. Noel if you need help locating them please give me call and I will walk you thru it. Olden
plans to begin work onsite next Monday June 28, 2010.
Thanks
Wade Geistweidt
Engineering Technician
2035 Central Circle suite 110
McKinney, TX 75069
o| 972.562.4677
c| 469.576.9951
f | 972.542.4366
Warning: Information provided via electronic media is not guaranteed against
defects including translation and transmission errors.
If the reader is not the intended recipient, you are hereby notified that any
dissemination, distribution or copying of this communication is strictly
prohibited. If you have received this information in error, please notify the
sender immediately.