Zach/Jennifer, Please review and sign as soon as possible. Understand that Rebcon states that they have already ordered and received the epoxy coated rebar for the wall in Reach 3. We will have to deal with that later. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Bruce Dunne [mailto:bdunne@icon-engineers.com] Sent: Friday, October 29, 2010 2:44 PM To: Clay Barnett Cc: Eric T. Little; Tom Forrest Subject: RE: Vitruvian Change Order #4 Good catch! Attached are PDF and a word version for you. From: Clay Barnett [mailto:cbarnett@addisontx.gov] Sent: Friday, October 29, 2010 2:35 PM To: Bruce Dunne Cc: Eric T. Little; Tom Forrest Subject: RE: Vitruvian Change Order #4 Bruce, Item 124 is listed twice. Once you change this, you will need to adjust the total. I have no other issues with it. Please correct and forward for signatures from North Texas. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Bruce Dunne [mailto:bdunne@icon-engineers.com] Sent: Friday, October 29, 2010 2:21 PM To: Clay Barnett Cc: Eric T. Little Subject: Vitruvian Change Order #4 Clay – attached is the revised Change Order #4 to eliminate the hard edge wall and replace it with a soil nail wall from the existing TxDOT bridge back upstream to the Bella Bridge. Please review and if you have any changes you would like me to make, just let me know. Thanks. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711