Zach - Attached is the revised Change Order # 2 to the Park contract. It includes the Ponte Avenue construction that was deleted from Phase 1B, the demolition items related to the existing box culverts on Ponte Avenue, and the demolition of the existing bridge just downstream of future Bella Lane. Please review and give me your comments on this. Thanks. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711