New Discussion Message As of 17-Sep-2010 10:02 AM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Thread: Project Discussions Topic: Irrigation Controller Locations CLICK HERE TO REPLY TO THIS TOPIC If you reply using your email client, your response will not be recorded in Projectmates. Author Eric Little Posted - 17-Sep-2010 10:02 AM CT Reviewed with Andres - there are no conflicts for their access requirements. NTC can proceed with installation as needed per their schedule. Notified Users Dave Wilde (Town of Addison) Slade Strickland (Town of Addison) Brad Rusk (Nathan D. Maier Consulting Engineers) Jules Roberts (UDR) Ron Lee (Town of Addison) Tom Lamberth (UDR, Inc.) Brian LaFoy (Nathan D. Maier Consulting Engineers) Robyn Jacobson (Kevin Sloan Studio) Nick Jacob (UDR) Jennifer Haynes (North Texas Contracting, Inc.) Wade Geistweidt (Kleinfelder) Clay Barnett (Town of Addison) Joel Massey Posted - 17-Sep-2010 10:00 AM CT Eric called and said construction access could be worked around and to proceed with the proposed north irrigation controller locations. Notified Users Joel Massey (Icon Consulting Engineers) Eric Little (UDR) Ron Lee (Town of Addison) Nick Jacob (UDR) Jennifer Haynes (North Texas Contracting, Inc.) Bruce Dunne (Icon Consulting Engineers) Clay Barnett (Town of Addison) Joel Massey Posted - 17-Sep-2010 9:57 AM CT VP-North Irrigation Controller Location.pdf 1"=10' Scale Exhibit showing proposed north irrigation controller locations was produced and discussed at the 9/16/10 construction meeting. Uncolored version of the exhibit is attached. No objections to the proposed irrigation controller locations at the meeting. Eric to discuss VP102 construction access and advise if proposed locations in conflict. Notified Users Joel Massey (Icon Consulting Engineers) Eric Little (UDR) Ron Lee (Town of Addison) Nick Jacob (UDR) Jennifer Haynes (North Texas Contracting, Inc.) Bruce Dunne (Icon Consulting Engineers) Clay Barnett (Town of Addison) Eric Little Posted - 2-Sep-2010 1:54 PM CT Per our meeting this morning the irrigation drawings are schematic only. The actual location of the controllers has to be determined. Please use this forum to discuss. Thanks, Notified Users Joel Massey (Icon Consulting Engineers) Ron Lee (Town of Addison) Nick Jacob (UDR) Jennifer Haynes (North Texas Contracting, Inc.) Bruce Dunne (Icon Consulting Engineers) Clay Barnett (Town of Addison) Joseph Angelone (American Landscape) .................................................................................. Copyright (c) 1999-2010, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software