Bruce, There are a few issues that need to be addressed prior to issuing a Notice to Proceed on the Park. They are as follows: 1. SWPPP – The town would prefer a separate SWPPP for the park. In addition to the other items in the existing SWPPP, we need to add a section that makes a commitment on the part of the contractor to prevent erosion that caused sediment to be deposited downstream or fill being placed that causes flooding upstream. These changes need to be incorporated into the SWPPP before it can be signed by the City Manager. 2. Final Plat – I have attached an email describing the comments on the Final Plat. 3. Vitruvian Park Hydrology – This item has been outstanding for sometime. I have attached the latest email on it. Basically the town must have a copy of the report stating that the development will not increase the peak discharge downstream. I know that David has made some progress on this issue. It just needs to be finished up. If you have any questions, please feel free to contact me. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857