Clay / Jennifer, Here is the list of quantity reduction items and their associated values. A couple of them will represent substantial savings for sure. Especially the electrical items and the lake wall if accepted. I have Craig Olden coming to the meeting with me tomorrow so we can discuss his possible alternatives to the provided design. I also tracked down an alternate fixture to the specified, but after the cuts the specified manufacturer has provided they are not cheaper. I think using galvanized poles and standard silver fixtures there is a good cost savings that will not change the esthetics. Look forward to tomorrow morning and give me a call today if you want to discuss any of these. I will bring about 10 copies of these to the meeting. Zach Fusilier North Texas Contracting 4999 Keller Haslet Road Keller, Texas 76248 Office - 817-430-9500 Cell - 817-819-6691