I’m fine with that. Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Tom Lamberth Sent: Wednesday, September 29, 2010 2:06 PM To: Bruce Dunne; Nancy Cline; Clay Barnett; Tom Forrest Cc: Eric T. Little; Jennifer Haynes; blafoy@ndmce.com; Brad Rusk; Nick Jacob Subject: RE: COE Site Visit to Vitruvian I want to meet on this first thing in the morning. Let's meet at 8am at Eric's trailer, prior to the bridge meeting. We are going to move very quickly on this. Please confirm your attendance. From: Bruce Dunne [mailto:bdunne@icon-engineers.com] Sent: Wednesday, September 29, 2010 2:00 PM To: Nancy Cline; Clay Barnett; Tom Lamberth; Tom Forrest Cc: Eric T. Little; Jennifer Haynes; blafoy@ndmce.com; Brad Rusk; Nick Jacob Subject: COE Site Visit to Vitruvian I received a phone call from Keith Bradley late yesterday. He had just received a call from Stan Walker, our COE project manager. Stan and his partner, Fred Land, had been out to the Vitruvian site yesterday, and in the words of Stan, he was “mortified” by what he saw. Stan was particularly disturbed by the lack of BMP’s in place, and the area upstream of the existing bridge where the concrete lining is and where Austin is currently working on Bella Bridge. He told Keith that he will make a second visit to the site here in the near future and he wants to see significant improvement in erosion control or he will have no choice but to issue fines (and for those unaware of the COE, these fines generally start in the six figures) and/or shut the project down. It is imperative that everyone focus on making sure we are doing everything feasible to get the BMP’s up to date and functional as quickly as possible before Stan’s next visit. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711