Eric,
I think that covers it all.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Brian J. LaFoy [mailto:blafoy@ndmce.com]
Sent: Thursday, July 22, 2010 3:50 PM
To: 'Eric T. Little'
Cc: Clay Barnett; 'Brad Rusk'
Subject: RE: Corps of Engineers Meeting
Eric:
With your addition of ABRs crossings, that is all we are aware of.
Brian J. LaFoy, P.E.
Vice President
Nathan D. Maier Consulting Engineers, Inc.
8080 Park Lane, Suite 600
Dallas, Texas 75231
Ph. 214-739-4741 / Fax 214-739-5961
blafoy@ndmce.com
________________________________
From: Eric T. Little [mailto:ELittle@udr.com]
Sent: Thursday, July 22, 2010 1:19 PM
To: jmassey@icon-engineers.com; Brian J. LaFoy; Bruce Dunne (bdunne@icon-engineers.com); Jennifer Haynes; Clay Barnett; Todd Henson
Cc: Nick Jacob; Tom Lamberth
Subject: Corps of Engineers Meeting
All:
I am aware of the following issues that need to be re-addressed with the CoE through KBA:
1. The addition of a temp low water crossing at Ponte for AB&R.
2. The requirement to build the creek walls prior to removing the creek channel bottom.
3. The requirement to remove the existing sediment at the existing weir via vacuum instead of by excavator.
4. NTC dewatering plan.
5. Any additional work we may want to do to address the erosion on the FB side of the existing weir.
6. Alternate seed proposed along the creek bank south of Ponte.
Obviously we will need to expand upon each one of these issues to present to CoE. Please let me know if there are other issues you feel should be brought up.
Thanks,
Eric Little
Project Manager, UDR
5430 LBJ Freeway, Suite 1250
Dallas, TX 75240
Ph: 972.774.0552
Fx: 972.991.4113
Cell: 214.641.5761
www.UDR.com