Eric, I think that covers it all. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Brian J. LaFoy [mailto:blafoy@ndmce.com] Sent: Thursday, July 22, 2010 3:50 PM To: 'Eric T. Little' Cc: Clay Barnett; 'Brad Rusk' Subject: RE: Corps of Engineers Meeting Eric: With your addition of ABRs crossings, that is all we are aware of. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas 75231 Ph. 214-739-4741 / Fax 214-739-5961 blafoy@ndmce.com ________________________________ From: Eric T. Little [mailto:ELittle@udr.com] Sent: Thursday, July 22, 2010 1:19 PM To: jmassey@icon-engineers.com; Brian J. LaFoy; Bruce Dunne (bdunne@icon-engineers.com); Jennifer Haynes; Clay Barnett; Todd Henson Cc: Nick Jacob; Tom Lamberth Subject: Corps of Engineers Meeting All: I am aware of the following issues that need to be re-addressed with the CoE through KBA: 1. The addition of a temp low water crossing at Ponte for AB&R. 2. The requirement to build the creek walls prior to removing the creek channel bottom. 3. The requirement to remove the existing sediment at the existing weir via vacuum instead of by excavator. 4. NTC dewatering plan. 5. Any additional work we may want to do to address the erosion on the FB side of the existing weir. 6. Alternate seed proposed along the creek bank south of Ponte. Obviously we will need to expand upon each one of these issues to present to CoE. Please let me know if there are other issues you feel should be brought up. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com