Clay these are the grasses that John Snowden sent, so yes look correct. Slade Strickland Director of Parks and Recreation Town of Addison P.O. Box 9010 Addison, Texas 75001-9010 Direct Office - 972.450.2869 Cell - 972.489.4426 Email - sstrickland@addisontx.gov From: Clay Barnett Sent: Friday, July 23, 2010 2:20 PM To: Slade Strickland Cc: Nancy Cline; Lea Dunn Subject: FW: Corps of Engineers Meeting Slade, Can you have a look at the grasses that we had talked about adding to the 404 permit and let me know if there are any that were missed? Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Thursday, July 22, 2010 3:45 PM To: jmassey@icon-engineers.com; Brian J. LaFoy; Bruce Dunne (bdunne@icon-engineers.com); Jennifer Haynes; Clay Barnett; Todd Henson Cc: Nick Jacob; Tom Lamberth Subject: RE: Corps of Engineers Meeting All: Change #1 below to: 1. The addition of temp low water crossings at Ponte and Bella for AB&R. The Bella crossing is attached. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Eric T. Little Sent: Thursday, July 22, 2010 1:19 PM To: jmassey@icon-engineers.com; 'Brian J. LaFoy'; Bruce Dunne (bdunne@icon-engineers.com); 'Jennifer Haynes'; 'Clay Barnett'; 'Todd Henson' Cc: Nick Jacob; Tom Lamberth Subject: Corps of Engineers Meeting All: I am aware of the following issues that need to be re-addressed with the CoE through KBA: 1. The addition of a temp low water crossing at Ponte for AB&R. 2. The requirement to build the creek walls prior to removing the creek channel bottom. 3. The requirement to remove the existing sediment at the existing weir via vacuum instead of by excavator. 4. NTC dewatering plan. 5. Any additional work we may want to do to address the erosion on the FB side of the existing weir. 6. Alternate seed proposed along the creek bank south of Ponte. Obviously we will need to expand upon each one of these issues to present to CoE. Please let me know if there are other issues you feel should be brought up. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com