Well, Just glancing at the contract, I believe we have 3,875lf of creek wall right? If so that would equal a change order of $42,625. Tom is on vacation today – let me go over this and the installation with him tomorrow. Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Jennifer Haynes [mailto:jennifer@ntexcon.com] Sent: Monday, July 26, 2010 2:18 PM To: Eric T. Little; 'Clay Barnett' Subject: Limestone Cap For Olden to hide the dowel, it will be $11.00/lf more. As a side note, they have added that they can decrease the dowel size from a #6 to a #4 to reduce the opening. Please let me know which direction we need to proceed as they need to order material and get going so they are not in the water installing this cap. Thank you, Jennifer Haynes, P.E. North Texas Contracting 4999 Keller Haslet Road Keller, Texas 76248 214-808-2821 cell