Eric, I am not surprised by this response. Now the price is the same and we are getting less than was originally indicated by NTC. I will look into the minimum radius for the directional drill installing a 6” HDPE Pipe and let you know what I find. Would you consider hiring this work privately? Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Eric T. Little [mailto:ELittle@udr.com] Sent: Monday, March 28, 2011 9:47 AM To: Joel Massey Subject: Fw: Revised Bores at Creek FYI From: Zach Fusilier [mailto:zfusilier@ntexcon.com] Sent: Monday, March 28, 2011 08:41 AM To: Eric T. Little; jennifer@ntexcon.com Cc: 'Chad' Subject: Revised Bores at Creek Eric, I have revised the figures per Joel’s request as well as added the credit for the concrete encasement. Please note that the footages called on the plans cannot be satisfied utilizing directional drill as the radius must be increased which in turns increases the footages. To directional drill you have to install on a sweeping radius and to get the depth under the creek the length of the bores are being adjusted to the minimum that we can install. This is the reason for the discrepancy between the neat bored lines on the plans and the actual in the field. Please take a look and let me know as this work needs to go in immediately as to avoid delays. Thanks again. Zach Fusilier North Texas Contracting 4999 Keller Haslet Road Keller, Texas 76248 Office - 817-430-9500 Cell - 817-819-6691