Wade,
I do not think it will be an issues.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Wade Geistweidt [mailto:WGeistweidt@kleinfelder.com]
Sent: Friday, July 08, 2011 10:18 AM
To: Clay Barnett
Cc: Rick Hammerberg; Leanna Morgan
Subject: Sidewalk
Clay,
Earlier this week Roger from Andre's Construction asked me to perform concrete testing on the sidewalk he placed along Vitruvian Way. Since this was ok with you in the past ( Phase
1B / Savoye 101) I went ahead and performed the concrete testing and charged time to the Phase 1C project. Is it okay to continued the extra testing on sidewalks as needed along Vitruvian
Way?
Thanks
Wade Geistweidt
Engineering Tech
2035 Central Circle Suite 110
McKinney, TX 75069
o| 972.562.4677
c| 469.576.9951
f | 972.542.4366