Wade, I do not think it will be an issues. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Wade Geistweidt [mailto:WGeistweidt@kleinfelder.com] Sent: Friday, July 08, 2011 10:18 AM To: Clay Barnett Cc: Rick Hammerberg; Leanna Morgan Subject: Sidewalk Clay, Earlier this week Roger from Andre's Construction asked me to perform concrete testing on the sidewalk he placed along Vitruvian Way. Since this was ok with you in the past ( Phase 1B / Savoye 101) I went ahead and performed the concrete testing and charged time to the Phase 1C project. Is it okay to continued the extra testing on sidewalks as needed along Vitruvian Way? Thanks Wade Geistweidt Engineering Tech 2035 Central Circle Suite 110 McKinney, TX 75069 o| 972.562.4677 c| 469.576.9951 f | 972.542.4366