Yes and they better. We need to get this off high center. Thanks, From: Joel Massey [mailto:jmassey@icon-engineers.com] Sent: Monday, April 25, 2011 12:57 PM To: Eric T. Little Cc: Clay Barnett; Bruce Dunne; Jennifer Haynes Subject: RE: South Bore Yes, at your trailer? Are they going to bring the plan? Joel From: Eric T. Little [mailto:ELittle@udr.com] Sent: Monday, April 25, 2011 12:44 PM To: Joel Massey; Jennifer Haynes Cc: Clay Barnett; Bruce Dunne Subject: RE: South Bore Joel, Can you meet Jennifer, the driller and I tomorrow morning at 9am so we can settle this? Thanks, From: Joel Massey [mailto:jmassey@icon-engineers.com] Sent: Thursday, April 21, 2011 12:58 PM To: Jennifer Haynes Cc: Eric T. Little; Clay Barnett; Bruce Dunne Subject: RE: South Bore Jennifer, We provided plan & profiles of the three crossings using the drilling parameters NTC provided to us. You and the driller called me back and said , “those parameters would not work”. I asked you and the driller to “markup” what you were proposing so we could verify that it would work with all of the other elements in the park. I need you and the drilling contractor to show me what you are proposing. At the north crossing, if I use the original alignment and the proposed 180’ length, the limits will be under the sidewalk, 3’ from the property line and 18’ from the irrigation main on the north and within 1’ of the retaining wall on the south. I have not looked at the south crossing. The new drilling radius is over 210’ which is very different than the 120’ previously provided. We need to have a design that will be accessible in the future for repairs. Eric, I suggest you setup a meeting with the Town, NTC, the drilling contractor and us to review the proposed design for acceptance. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Jennifer Haynes [mailto:jennifer@ntexcon.com] Sent: Thursday, April 21, 2011 12:37 PM To: Joel Massey Cc: 'Eric T. Little' Subject: RE: South Bore The north and south follow the exact alignment that you have shown. Please use the centerline of the creek as your reference point. From: Joel Massey [mailto:jmassey@icon-engineers.com] Sent: Thursday, April 21, 2011 12:25 PM To: Jennifer Haynes Cc: Eric T. Little Subject: RE: South Bore Jennifer, I need the plan view for the north crossing and the south crossing showing the proposed crossing location and length limits. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Jennifer Haynes [mailto:jennifer@ntexcon.com] Sent: Thursday, April 21, 2011 12:18 PM To: Joel Massey Cc: 'Eric T. Little' Subject: South Bore This includes the southern bore as well. Please let me know as soon as possible if this is acceptable. We need to get the bore in at Ponte asap. Thank you, Jennifer M. Haynes, P.E. North Texas Contracting, Inc. (214) 808-2821 cell