Eric, There should not be any issues related to provisions for the Parking Cube Signs. Provisions for the Parking Cube Signs have been provided at all locations in the Phase 1B Infrastructure package now complete. Parking cube sign locations were shown on the Phase 1B plans for conduit route from the nearest street lighting pole base. Operation of the sign lighting is to be connected to the street lighting controls as indicated on the sign plans. Phase 1B related sheets are attached for your reference. Andres Construction provided a thicken concrete base with conduit in place (below the existing pavers) for the parking cube sign location on VP101 at Ponte Ave. All Parking cube sign locations are included the Phase 1C published proposed layout CAD file BP1VPcPBS. The location of the parking cube sign at park road is shown on Phase 1C sheet C203. The coordinate locations for the two along Ponte Ave. can be taken from the published CAD file or we can provide. Wiring of the signs to the street lighting circuit was to be provided by the sign sub-contractor. Please let me know if you have any additional questions concerning provisions for future construction. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Eric T. Little [mailto:ELittle@udr.com] Sent: Friday, September 24, 2010 12:07 PM To: Tom Forrest; Tom Lamberth Cc: Clay Barnett; Joel Massey Subject: Vit Park - Signage Issue Gents (and Clay), Was talking to Jennifer today and she asked a very good question. Currently the signage package calls for these PK1 signs at the corner of Park Road and Vit Way and at the garage entry areas into Savoye One and Two. They are shown to be lighted, but there is no power shown to them anywhere on the plans that I can see. Plus the one at Savoye One would require demo of even more pavers to build the footer and bring power to it. I honestly don’t see the point in these signs at least on Ponte and I would recommend deleting them there and keeping the one at Park Road. Thoughts? Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com