We are going to try to schedule a time to go out there. Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Wednesday, August 25, 2010 10:08 AM To: Clay Barnett Subject: RE: Vitruvian Channel Section Ok. What concerns do you have? Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Clay Barnett [mailto:cbarnett@addisontx.gov] Sent: Wednesday, August 25, 2010 10:06 AM To: Eric T. Little Subject: RE: Vitruvian Channel Section Eric, The best thing would be a field visit. I know that Nancy and I have some concerns about how they are currently progressing. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Wednesday, August 25, 2010 9:36 AM To: Clay Barnett Subject: RE: Vitruvian Channel Section Thanks. Any news on the trees that need to come out at Ponte? Do I need to get with ICON and redesign the walls and the flow path of the creek? Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Clay Barnett [mailto:cbarnett@addisontx.gov] Sent: Wednesday, August 25, 2010 9:32 AM To: Eric T. Little Subject: RE: Vitruvian Channel Section Eric, Attached are the existing weir plans. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Tuesday, August 24, 2010 7:15 AM To: Jennifer Haynes; Clay Barnett Subject: FW: Vitruvian Channel Section Jennifer, NDM will be onsite at 7:30 this morning. Clay, When you come out today, can you bring copies of the drawings on the existing weir so I can copy them? Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: blafoy@ndmce.com [mailto:blafoy@ndmce.com] Sent: Monday, August 23, 2010 11:02 PM To: Eric T. Little Cc: brusk@ndmce.com Subject: Re: Vitruvian Channel Section Brad Please meet Eric on site at 7:30. I will be by around 9 or 9:30. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas. 75231 Ph. 214-739-4741 / Fax 214-739-5961 On Aug 23, 2010, at 9:16 PM, "Eric T. Little" wrote: 7:30am will work. From: Brian J. LaFoy [mailto:blafoy@ndmce.com] Sent: Monday, August 23, 2010 08:12 PM To: Eric T. Little Cc: 'Brad Rusk' Subject: RE: Fwd: Vitruvian Channel Section What time? I can probably get Brad there first a.m. and then I can get there by 9 or so if necessary. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas 75231 Ph. 214-739-4741 / Fax 214-739-5961 blafoy@ndmce.com ________________________________ From: Eric T. Little [mailto:ELittle@udr.com] Sent: Monday, August 23, 2010 8:41 PM To: 'blafoy@ndmce.com' Subject: Re: Fwd: Vitruvian Channel Section Nah, just you or Brad will be fine. Nancy wants one of you two there while we are excavating. Its the only way she will be comfortable. From: Brian J. LaFoy [mailto:blafoy@ndmce.com] Sent: Monday, August 23, 2010 07:38 PM To: Eric T. Little Cc: blafoy@ndmce.com ; 'William L. Wallace' ; 'Brad Rusk' Subject: RE: Fwd: Vitruvian Channel Section Bill should really be there, but I know he's tied up until about 2:00. I can be there around 9 but need to be back at my office by 11 for a meeting. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas 75231 Ph. 214-739-4741 / Fax 214-739-5961 blafoy@ndmce.com ________________________________ From: Eric T. Little [mailto:ELittle@udr.com] Sent: Monday, August 23, 2010 5:29 PM To: 'blafoy@ndmce.com' Subject: Re: Fwd: Vitruvian Channel Section Need one of you guys to meet me in the morning please. From: blafoy@ndmce.com [mailto:blafoy@ndmce.com] Sent: Monday, August 23, 2010 04:02 PM To: Eric T. Little Cc: Brad Rusk ; William L. Wallace Subject: Fwd: Vitruvian Channel Section Eric I had some concerns on Bruce's response and the plan to move forward so I discussed with Bill further. We can't really comment on what is proposed other that what we've already said since it hasn't been modeled. Please see Bill's additional remarks below. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas. 75231 Ph. 214-739-4741 / Fax 214-739-5961 Begin forwarded message: From: "William L. Wallace" Date: August 23, 2010 4:54:09 PM CDT To: Subject: RE: Vitruvian Channel Section Brian, As we have discussed before, I believe there are signs of erosion in this reach under current conditions. The previous hydraulic model showed that the velocities would be increased in this area by the original plan. I anticipate that to make matters worse. The latest section from Bruce increased the velocities further. I believe that is not a good idea. I have run hydraulics on the latest section from Bruce, but not on anything else. I do not know the impact of what Eric is proposing. I do not think that decisions should be made without knowing the impacts. I will run additional sections for them if them can tell me where they are starting the benches and the proposed flowline. I will be at meetings tomorrow until about 2 pm. Bill William L. Wallace, P.E. Executive Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite #600 Dallas, TX 75231 PH: (214)-739-4741 ________________________________ From: blafoy@ndmce.com [mailto:blafoy@ndmce.com] Sent: Monday, August 23, 2010 4:34 PM To: William L. Wallace Cc: Brad Rusk Subject: Fwd: Vitruvian Channel Section Comments? I need to know ASAP. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas. 75231 Ph. 214-739-4741 / Fax 214-739-5961 Begin forwarded message: From: "Eric T. Little" Date: August 23, 2010 4:20:12 PM CDT To: Nancy Cline , 'Bruce Dunne' , Clay Barnett , Joel Massey , Tom Lamberth Cc: "Brian J. LaFoy" , Brad Rusk , Nick Jacob Subject: RE: Vitruvian Channel Section All, We are out of time here. This work was supposed to begin tomorrow, but without knowing what we are supposed to do on the creek bottom, it’s almost impossible to move forward. I’m going to instruct them to go ahead and start 3’ in and then cut to a 10:1 V. If we change it will be easier to cut down to a 3:1. Also need to know what we are supposed to do for the recirc pump at the existing weir. Need help here please. Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Nancy Cline [mailto:ncline@addisontx.gov] Sent: Monday, August 23, 2010 10:44 AM To: 'Bruce Dunne'; Eric T. Little; Clay Barnett; Joel Massey Cc: Brian J. LaFoy; Brad Rusk Subject: RE: Vitruvian Channel Section Last week I requested cross sections at 50 ft intervals. Would you please send these as I requested? Nancy Cline From: Bruce Dunne [mailto:bdunne@icon-engineers.com] Sent: Monday, August 23, 2010 10:42 AM To: Eric T. Little; Clay Barnett; Joel Massey; Nancy Cline Cc: Brian J. LaFoy; Brad Rusk Subject: RE: Vitruvian Channel Section The proposed cross section change, as submitted to the Town last week for the area of the creek south of the Ponte Avenue bridge to the existing weir structure, will result in a miniscule increase in velocity in this area of the creek. The cross section of the creek would decrease by 12 square feet. The average area of flow in this area was originally proposed to be 1150 square feet, so theoretically this area would be decreased to an average of 1138 square feet, resulting in an increase in velocity from around 7.80 feet per second to 7.88 feet per second. If this is unacceptable to the Town, I would suggest we go back to the original cross section proposed on the drawings. After seeing the creek last week with the water drained out, I feel the section as originally designed will work just fine. From: Eric T. Little [mailto:ELittle@udr.com] Sent: Monday, August 23, 2010 9:56 AM To: Clay Barnett; Bruce Dunne; Joel Massey; Nancy Cline Cc: Brian J. LaFoy; 'Brad Rusk' Subject: FW: Vitruvian Channel Section All, Mr. Wallace has reviewed the new cross section and he is concerned that we are going to end up increasing the velocity of the creek by changing from a 10:1 to a 3:1 in the channel bottom. We need direction on this ASAP as they are scheduled to start grading tomorrow. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com From: Brian J. LaFoy [mailto:blafoy@ndmce.com] Sent: Monday, August 23, 2010 9:51 AM To: Eric T. Little Cc: 'Brad Rusk'; William L. Wallace Subject: FW: Vitruvian Channel Section Eric: I was on vacation last week but reviewed Brad and Bill's response on the downstream channel work this morning. See below for NDMs response. Brian J. LaFoy, P.E. Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas 75231 Ph. 214-739-4741 / Fax 214-739-5961 blafoy@ndmce.com ________________________________ From: Brad Rusk [mailto:brusk@ndmce.com] Sent: Friday, August 20, 2010 8:51 AM To: blafoy@ndmce.com Subject: FW: Vitruvian Channel Section Brian, Bill's response below regarding the proposed revised channel section for Vitruvian south of the Ponte bridge. Brad Rusk CPC, CCCA Construction Manager Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, TX 75231 ph. 214.739.4741 fax 214.739.5961 -----Original Message----- From: William L. Wallace [mailto:bwallace@ndmce.com] Sent: Friday, August 20, 2010 8:39 AM To: Brad Rusk Subject: Vitruvian Channel Section Brad, You asked me to review the proposed cross-section for the channel grading downstream of the Ponte Bridge. I had two initial concerns: did it meet the intent of the 404 permit and was it consistent with the hydraulic model. I looked at both issues. 404 Permit - Ex. 10, Fig. 2 shows the proposed general section in this area. Although the proposed section is not the same, they both show grading in the channel. For purposes of the 404 permit, I believe they both show similar intents. Hydraulic Model - There are two sections in the model in this area. Section 6.272 and 6.303. Section 6.272 is the more critical because there are high channel velocities at this natural creek section. The proposed section is not consistent with the hydraulic model. The proposed section is deeper and with steeper bottom cross-slopes. The hydraulic model shows approximate 10:1 slopes versus the new section has a 3' bench area and 3:1 slopes. To get an idea of the possible impacts I revised the HEC-2 model to more closely represent the new proposed section. Revising the section had 2 impacts. Generally the water surface elevation increased by about 0.1 feet. This increase did not extend upstream into the area where there were increases over existing conditions. The change did increase the channel velocities. The following summarizes the velocities at Section 6.272 Corrected Existing = 8.6 fps Previous Proposed = 9.2 fps Revised Proposed = 9.6 fps I remain concerned about the channel velocities in this area and do not recommend sections that result in additional increases to the velocity in this sensitive area. Let me know if you have questions concerning this. Thanks Bill William L. Wallace, P.E. Executive Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite #600 Dallas, TX 75231 PH: (214)-739-4741 ****************************************************************************************************************** This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you. ******************************************************************************************************************* ****************************************************************************************************************** This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you. ******************************************************************************************************************* ԯᕟᛏ￟켅㿪켊�-༏ჿᄟሯጿᑏᡟ᧟᫯￿鼘I༫Ἤ�>༠⇿∟⌯␿╏♟❯⡿マ缰⼇㼈輶�S༵㛿㜟㠯㤿㩏㭟㱯⵿_伮弯ཌྷ὎⽏༽㼱ག䏿䐟䔯䘿䝏䡟䥯䩿マ齋ὐ⽑㽒�㽡佢彣哿唟嘯圿塏奟婯孿マ齜꽝뽞콟뽧漾缿콭槿樟欯氿浏湟潯灿マ齱꽲뽳콴�뽽ཹ竿笟簯紿繏罟聯腿マ龂꾃뾄쾅�ネྊ诿谟霯踿轏遟酯鉿マ龓꾔뾕쾖�ルྛ鳿ꜟ鸯鼿ꁏꅟꉯ捿￿ཥὦླᾴ⾵㾶ᾤྨ꧿ꨟ꬯갿굏깟꽯끿マ龱꾲⾷㾸侹㿇俈忉뫿묟밯봿빏뽟쁯셿マ鿂꿃뿄쿅뿍 쿎羥辦쿿퀟턯툿퍏�핯홿マ鿗꿘뿙翊迋鿌俪快󯽟マ鿤꿥뿦쿧�濮翯ﺏソマ鿵꿶뿷쿸�࿽ӿۿ��ۏݟ࡯ॿマ鼊꼕뼌켍�0༒᏿ᐟᔯᘿᝏᡟ᥯᩿マ鼥꼜뼝켞�"ӿㄏ㉿㎏ҟ⋟⚏❿マ鼨꼩뼪켫�N༰ㇿ㔟㚟㞯䖿䚯䞿㣏マ鼹꼺뼻켼�_ཁ䋿䌟䐯䰿∯⏟⓯䷿マ齎꽏뽐콑�tབ埿堟䠯䧯䯿栏榿櫏￟�콙뽝콞�。ལ擿攟是朿桏江淟滯￿スཿ콯�イུ痿瘟眯砿祏穟筯荿ッ὚⽛㽜쾄�ヌྉ铿謟谯贿蹏轟遯酿マ 龒꾓뾔쾕�リྚ鯿鰟鴯鸿齏ꁟꅯꉿマ復꾤뾥쾦�ᄅྫ곿괟긯꼿聏膏芟뾯￟￁�辄�ᄊྸ맿먟묯밿뵏빟쉯쏯￿࿅꿂࿔῕⿖ᅦ࿉쫿쬟찯촿칏콟큯텿マ鿒迚㾱侲鿠ᅵ࿞�マ俗忘濙ῷ⿸㿹ῧ俛マ鿴꿵⿺㿻俼伋弌෿﹯O?ŏɟͯѿマ鼅꼆뼇켈�켑翨迩៿Ꮯᐯᔿᙏ᝟ᡯ᥿マ鼚꼛뼜켝�@켧⏿␟┯☿❏⡟⥯⩿マ鼫꼬㼊뼎켏�伾弿䃿⹯㉏㌿㑏㕟㙯㝿マ鼸꼹뼺켻�彁潂罃凿副卿䒏䕏䙟䝯䡿マ齉꽊뽋콌�oད壿⿿ク徿 娏孟屯嵿マ齞꽟뽠콡�㽑뽕囿埏痟皏瞟斯榏橿マ齫꽬뽭콮�アཱི瓿砟禟窯袿覯調篏マ齼꽽뽾콿�ツ྄藿蘟蜯蠿遏昿柯雿o龑꾒뾓쾔�ラྙ髿鬟鰯鴿鹏齟ꁯꅿマ龢꾣뾤쾯�ᄄྪ꯿갟괯긿꽏끟녯뉿マ龳꾴뾿쾶�ᄍྻ볿봟븯뼿쁏셟쉯썿マ鿄꿅뿆쿇�ᅧ࿌췿츟퐯탿텏퉟퍯푿マ鿕꿖뿗쿘�꾌뾍軿�避マ鿢꿣뿤쿥�│࿪o¯ƿマ鿳꿴뿵쿶�࿻ﳿﴟ︯ؿ��೯ܿマ鼈꼉뼊켋�.༐ᇿሟȯϯ׿∏⎿Ⓩ￟뼒뼗켘�; ༝ỿ἟ ℿ╏⛏⟟◯マW༹켩�L༮⿿〟ㄯ㈿㍏㑟㕯㵿ッἔ⼕罃켾�aགྷ䓿䔟䘯䜿䡏䥟䩯䭿マ齌潓뽎콏�rཔ嗿嘟圯堿㕏㫟㭟㱯ソェཬ�⦅ཡ拿挟搯政晏束桯汿￿཮Ὧཽ὾⽿㾀ーི珿琟甯瘿睏硟祯穿マ齻꽼龄佛彜꾊ナ྇裿褟訯謿豏赟蹯轿マ�征澂羃⾡㾢侣⾑闿队霯頿饏驟魯鱿マ龝꾞뾟㾤侥徦侴徵뛿띯꡿ꤿ꩏ꭟ걯굿マ龮꾯뾰쾱��辒鏿솟뷯븿뽏쁟셯쉿マ鿃꿄뿅쿆�￉࿋퇿췟츯켿큏텟퉯퍿マ鿔꿕뿖쿗�ᅳ࿜���マ鿥꿦 ᄌྺ꾷俸忹﫿マ鿲꿳뿴쿵�忻濼翽௿౯ൿﺏo_ůɿマ鼃꼄뼅켆�)ዿᓏᕟᙯ᝿マ鼢꼙뼚켛�꼎뼏ჿ໏⽯わ㆟ᾯ⎏⑿マ鼥꼦뼧켨�K༭⻿㈟㎟㒯䊿䎯䒿㗏マ鼶꼷뼸켹�\༾㿿䀟䄯䤿䨯‿⇯⏿/齋꽌뽍콎�qན哿唟嘯圿塏奟婯孿マ齜꽝뽞콩�「ཤ旿䘟䜟䠯甿皯瞿䧏/뽦꽪뽫콬�ッཱ狿猟琯甿祏竏篟觯￟ヒ뽼콽�タྂ菿萟蔯蘿蝏衟遯束/Ὠ⽩뾑쾒�ユྡ飿餟騯鬿鱏赟踟輯_ᆳྯྐンᄁྤꗿꘟꜯ꠿ꥏ꩟ ꭯걿マྱᾲ⾳῁⿂㿃ᄈྵ뛿뜟렯뤿멏뭟뱯뵿マ龾꾿鿇侞徟澠￈࿊쯿찟촯�콏큟텯퉿マ鿓꿔뿕쿖�￙࿛����マ鿤꿥뿦迭�↑࿬マ鿵꿶翽쿸�࿽?/Ŀɏ쁟쑯엯￿࿇3༕἖#(༊௿టയ฿ཏၟᅯቿマ༗Ἐ⼙ἧ⼨㼩9༛᳿ᴟḯἿ⁏⅟≯⍿マ鼤꼥뼦꼮弅漆뼴༰ㇿ㈟㌯㐿㕏㙟㝯㡿マ鼹漫缬輭㽋佌彍㯿㼿䀯䄿䉏䍟䑯䕿マ齆꽇뽈콉低彏潐彞忿息兿刿协呟啯噿マ齗꽘뽙콚�}㳿㶟殯柿桏楟橯歿マ齬꽭뽮콯�イུ痿 瘟眯砿祏穟蕯籿マ齽꽾뽿쾀콡�轡鋿鍯鑿芏虯蝟衯西マ龊꾋뾌쾍�ミ羕雿鞏ꖟꚏꞟ颯饯驿マ龛꾜뾝쾞�ᄀྣ꓿脟궯茟蓏藟껯꽿マ龰꾱뾼쾳�ᄊྸꣿꧏ꫟꣯즏쪯쮿맏ᆵ龽꾾뾿쿀�ᅢ࿅웿윟젯찿춿컏��￟꿏뿐쿑�ᅯ࿖퟿����롟뭟/ᾼ⾽뿥쿦�￳࿫マ鿴꿵뿶쿷�࿼﷿︟O?ŏɟͯѿマ鼅꼆뼇켈�+།໿༟ᾏ₿⇏￟忣켐뼔켕�8༚᯿ᰟᴯḿ὏⍟ⓟ◯￿T༶켦�I༫⳿ⴟⸯ⼿くㅟ㉯㩿ッἑ⼒㼓켻 �^ཀ䯿䈟䌯䐿䕏䙟㝯㠯_伹vམὙἺ཈kཌྷ仿伟倯儿剏卟呯啿マ齖Ὓ⽜㽝⽫㽬佭ཞ忿怟愯房捏摟敯晿マ齧꽨뽩꽱彈潉罊ཱི瓿生瘯眿艏祟穯筿マ齼꽽뽾콿�ツ྄藿蘟蜯蠿襏詟譯豿マ龍齮꽯뽰⾞㾟侠⾎迿錿鐯锿陏靟顯饿マ龚꾛뾜㾡侢徣澤徲돿둯ꕿ꘿ꝏꡟꥯꩿマ龫꾬뾭쾮��辏郿醟몯묿뱏뵟빯뽿マ鿀꿁뿂쿃�龵꾶뾷헿홯흿얏왯쩿쭯챿マ鿍꿎뿏쿐�ᅮ翘�����マ鿞꿟뿠쿡�¦࿦옟쟏죟マ鿳꿴뿵쿶�࿻ﳿﴟ︯_ُğɯͿ マ鼄꼅뼆켇�*༌෿ฟ༯ᘿᄏ቟፯ᑿマ鼕꼖뼗켘�;༝ỿ἟ ℿ≏⍟⑯⽿マ鼦꼧뼨켩�L༮⿿〟ㄯ㈿㍏㑟㽯㙿鼷꼸뼹쨺䬪䱏䵟ッ罎轏齐橑輻鼼轀齁䈯䎯䒿へ慓搯槬塶奏束慉녇ꁛ峿嵯婿孿嶏巯抯忏Å汢捯煫潵瓾㱘녇竮ὣ⽤콨齟惿枯櫯湏搟旯泿濏O潳ッ꽫轲뽸뽵ー矿硯穿翟䘟䜟䠯䤿o潑⾇㾈侉徊澋뽑趯蹟软卿⦅潔罕轖齗彽ཱྀᾂ⾃萃䤿哬楨⁳ѥ洭湡兤ㆡ⁹ꅦ攐날९灿瑡逽档敭渤ꁴ環ꅲ獀⩭ꉩ敠悡ꍷ桰焠炣挠ꉯ鷐ꃡ䦰滌ꉦꀠ瓰ꑩ ꍠ븀ꉨꑐꀐ꒰ꅑ擀솢榼ꅡ鰤睰ꄀ柑ꂣ⺪璠籤異늢ꀠꏰꂡ喤倠晲持銣䠜ꙥꏀꓱ⣪䡐䧌ꈩ昒栀罥鉰뿀ྥ䆬ၦ傡ꆣ悤ꅬꎡ↢Ƭ甠깳濐긯銲盀꛱畠삦猨ꮇꆠꙂ璂⡹ꅩ觰ꂫ潴삣潨ꑭ턒ꆠ摡鱤玀¯솧䧢潹ꅵ鰰꾀捕떭肜楣녰ꈰⳐꆝ疰›ኬ捳恼獞債芳炜ꁯ抐ꍟꍰ뎥ꑐ똰烁↬띡삷삱䂧ꕺ뉃滻f댿뒿ꇆ떂뗈ꐠ灐ﵹ삒땧꜠꘱붑ꈒ긡ퟷ掭碬ꆠꍳ椐䆮똷ꛉ뛳猐·䆮⁡꟝潠킝厥ㆯꍦ겠뼠솦↢킿傢킮킝ꅷ椳肜畧㓂뉳ꗷ皰껻듐斑wꆣ龾憩€ꧭ犠ㆽ꽡ꘁꅰ俠뇃↤䊡ƺ晩ꂡ ꍡꅠ䭠낥膧邠僁딃ꉐ⁁㜹ⴲ⠴〵鰭㘰䂜浩ꊿ皰쏰꺡Ꝁꇒ歀㊳⻾뾐쾑�濎翏运铿閿雏韟飯髿鬏鰟O㾝侞徟꿨￑࿓῔迡풯헯퟿���_翠応濝翞迟�羅﨟￯→࿭΅ྲྀίἂ往꼅㶍㔨퇯䁼摯ﱹ瞞漇)꛻ﴷұﲢ㎝ଅ綅퀎