Eric, I would like to know where we are on the following for the park: 1. Status of Water Rights Permit by Icon 2. Status of the concrete cap mock-up for the lake edge walls 3. Silt fence along the perimeter of the park 4. Removal of the wire from the rock check dam south of the south property line 5. Discussion of the two failing attached concrete samples 6. Status of prices for the change order 7. Information on the RFI for making the 4” cap 1.5” And on the bridges: 1. Status of prices for the change order 2. The different pedestrian bridge On the street: 1. Panel replacement where the missing valve stack was 2. 30 mph sign removal 3. Adding a repeater for the signal to the top of Savoye Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Eric T. Little [mailto:ELittle@udr.com] Sent: Wednesday, September 01, 2010 2:08 PM To: Tom Forrest; Tom Lamberth; Lea Dunn; Nancy Cline; Clay Barnett; Brian J. LaFoy; Brad Rusk; 'wgeistweidt@kleinfelder.com'; 'Jennifer Haynes'; Ron Lee; Slade Strickland Cc: Deiadra Burns; Nick Jacob Subject: Vitruvian Park Infrastructure - Phase 1C - Parks and Streetscapes - Meeting No. 16 Agenda and Meeting No. 15 Minutes All, Attached is the agenda for our meeting tomorrow and the minutes from the meeting last week. Thanks, Eric Little Project Manager, UDR 5430 LBJ Freeway, Suite 1250 Dallas, TX 75240 Ph: 972.774.0552 Fx: 972.991.4113 Cell: 214.641.5761 www.UDR.com