Jennifer, I don't believe anyone else has any comments. Please proceed with installation per the mock up and the notes below. Thanks, Eric From: Robyn Jacobson [mailto:rdj@kevinsloanstudio.com] Sent: Thursday, August 05, 2010 01:37 PM To: Tom Lamberth; Lea Dunn ; Carmen Moran ; Cline, Nancy S. ; Clay Barnett ; Slade Strickland Cc: Eric T. Little; Nick Jacob Subject: RE: Lake edge wall cap Also, we recommend that the joints between limestone segments be tighter and more refined than what is presented on the current mock-up. Currently they seem to be of inconsistent widths and texture. A straight and tight as possible joint is preferred. ________________________________ From: Tom Lamberth [mailto:TLamberth@udr.com] Sent: Thursday, August 05, 2010 2:30 PM To: Lea Dunn; Carmen Moran; Cline, Nancy S.; Clay Barnett; Slade Strickland Cc: Eric T. Little; Nick Jacob; Robyn Jacobson Subject: Lake edge wall cap We have reviewed the mock up and UDR recommends the caps that are drilled through with the mortar filler. The CM team will need to closely manage the installation to insure that the quality of the mock up is carried out over the entire installation in terms of the color match but we believe we can get the look that we all want. As such, Eric needs to give North Texas final direction so please weigh in before EOB today if you feel differently. Thanks. Tom Lamberth UDR 972 716 3560 (O) 214 662 1088 (C)