>> Leave comment << Response to RFI No. 56 As of 8-Feb-2011 4:20 PM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Status: Outstanding Overdue Subject Limestone Boulders Reason Code None Question The bid item says 3’ diameter but the drawing looks like a block. We are guessing what is wanted is the block. The problem Rebcon's finding is that the block is limited by the natural limestone seams at the quarry. We can get these in 3’x6’x18”-22” size. The one dimension doesn’t meet the 3’ minimum but the overall size exceeds the 3x3x3 shown on the plans which should give the block enough heft not to wash away. Attached are some photos of what they have. Proposed Solution Attached Files P1010133.JPG Legends Crossing block IV.jpg P1010097.JPG P1010098.JPG P1010100.JPG Section: 2 - Sitework Int. Tracking #: Days Elapsed: 8 From: Jennifer Haynes Originated: 31-Jan-2011 2:19 PM CT To: Nick Jacob (First Recipient) Requested By: 3-Feb-2011 12:00 AM CT (Original 3-Feb-2011 2:11 PM CT) Copy to: Joel Massey Eric Little Victor Lissiak III Robyn Jacobson Mark Gaines Clay Barnett Additional Info Proposed Solution Impact Critical Path? Yes Cost Change: Yes, may be Time Change: None Discipline Code: N/A Drawing Numbers: Needs Drawing Change? N/A History (Chronological Order) Type Routed Billable n/a Memo Robyn, Please review and comment. Thanks, Attached Files (none) From: Eric Little Sent: 31-Jan-2011 2:20 PM CT To: Robyn Jacobson Requested By: 3-Feb-2011 2:11 PM CT Copy to: Slade Strickland Ron Lee Nick Jacob Jennifer Haynes Clay Barnett Type Response Billable n/a Memo The 3'-0" x 6'-0" x 18"-22" size range is acceptable. The photos of similar installations are acceptable also. However, we would like to be on site as much as possible for the installation to assist in placement to yield the best joints between stones and uniformity of the top surface quality. Attached Files (none) From: Robyn Jacobson Sent: 8-Feb-2011 4:20 PM CT To: Eric Little Requested By: 3-Feb-2011 12:00 AM CT Copy to: Joel Massey Eric Little Victor Lissiak III Robyn Jacobson Nick Jacob Jennifer Haynes Mark Gaines Bruce Dunne Clay Barnett Final Response (Closing) This item is still open. No final response to display. .................................................................................. Copyright (c) 1999-2011, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software