>> Leave comment << Response to RFI No. 70 As of 18-May-2011 10:40 AM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Status: Outstanding Overdue Subject Sidewalk at Ponte Avenue Reason Code None Question On Sheet C601 and C602 Paving Plans, there is a sidewalk shown to be at the top of the handicap ramps/stairs. There are no elevations shown on the grading plan or the landscape plan. Given the plans to extend Ponte Avenue, is that the correct configuration of the sidewalk? If so, please give elevations. Proposed Solution Attached Files (none) Section: 2 - Sitework Int. Tracking #: Days Elapsed: 6 From: Jennifer Haynes Originated: 12-May-2011 3:18 PM CT To: Nick Jacob (First Recipient) Requested By: 15-May-2011 12:00 AM CT (Original 15-May-2011 3:13 PM CT) Copy to: Joel Massey Eric Little Robyn Jacobson Wade Geistweidt Clay Barnett Additional Info Proposed Solution Impact Critical Path? Yes Cost Change: Yes, may be Time Change: None Discipline Code: N/A Drawing Numbers: Needs Drawing Change? Yes History (Chronological Order) Type Routed Billable n/a Memo please review and give direction Attached Files (none) From: Nick Jacob Sent: 18-May-2011 8:59 AM CT To: Joel Massey Requested By: 15-May-2011 3:13 PM CT Copy to: Eric Little Robyn Jacobson Type Response Billable n/a Memo The configuration of the sidewalks shown are still correct. The plan was a straight grade from the top of the curb ramp to the top of the stair at the elevation shown on the grading plan, sheet C302, attached. These sidewalks cannot be installed before the street paving and curb ramps are complete. I am not aware of the current plan for the Ponte Ave. paving that was originally in the Phase 1B contract. The current plans for the Ponte Ave. extension do not include any streetscape / hardscape and these sidewalks will serve as an interim connection to the street. As-built survey of the ends of the bridge paving will be completed this week. Any additional elevations that are needed will be provided. Attached Files Page C302 from _VPConstr.pdf From: Joel Massey Sent: 18-May-2011 10:40 AM CT To: Nick Jacob Requested By: 15-May-2011 12:00 AM CT Copy to: Joel Massey Eric Little Robyn Jacobson Nick Jacob Jennifer Haynes Wade Geistweidt Bruce Dunne Clay Barnett Final Response (Closing) This item is still open. No final response to display. .................................................................................. Copyright (c) 1999-2011, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software