Per our discussion last Thursday and for additional discussion in the Vitruvian Park construction meeting tomorrow morning, attached are two exhibits (plan and elevations) showing the proposed street fountain equipment (vault and RPZ enclosure). Because of the proposed (and future) location of this equipment at the Vitruvian Way and Ponte Avenue intersection, these exhibits were prepared for visualization of the proposed equipment and to determine how this equipment may be screened effectively. Also attached are three photographs, one of the front of the Savoye building where the street fountain will be constructed and two of typical equipment vault and RPZ enclosure installations. Please review the exhibits and photographs and be prepared to discuss the following: 1. Is the proposed (and future) street fountain equipment, with landscaping around it, acceptable. 2. What landscaping is needed for it to be acceptable. 3. What materials and colors are needed for the equipment enclosures. 4. Are there any alternate options for the proposed (and future) street fountain equipment. See you at the meeting. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com