Attached is Addendum Number 1. I heard back from Victor and you were correct. The piers for the Lake Edge wall increased by 5,830 vertical feet (only about $300,000). He swears he checked all the other pier quantities and that is the only one that was wrong, so I have incorporated this into the addendum. Let me know if there is anything else. BRUCE F. DUNNE, P.E. President icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 707-9711