Clay, Please see the questions sent to Bruce Dunne and his responses. Do you know when the addenda will be issued? I have a couple more questions that I need to ask. Email #1 See answers to your questions in RED. Let me know if you have any other questions. _____ From: Jarvis Ward [mailto:jward@ntexcon.com] Sent: Tuesday, November 17, 2009 11:56 AM To: Bruce Dunne Subject: Vitruvian Park - Phase 1C Bruce, Please see the following questions pertaining to the Vitruvian Park project. 1. Are we to include the removal of all the paving and bridges/box culverts that are onsite now? The removal of the box culverts is in your contract for Vitruvian Way. The removal of the bridge is in another bid package (Bridge Package), and the pavement to be removed is denoted on the demolition plans (Sheets C101, 102 and 103. 2. Are we to include all of the tree removal that is on the fence/property line at the South end of the project? The only trees to be removed are those shown on the demolition plans (Sheets C101, 102 and 103). 3. How are we to bid the grading with the spoils that are left onsite from Vitruvian Phase 1B? These spoils are not shown on the existing topo plan for Phase 1C. The majority of the spoils that are located on this project were placed there by North Texas Contracting and will be removed or relocated off site (either by NTC or by others) prior to the start of this project. Email #2 Jarvis - Item #275 is a bid item that is set up to establish a price. At this time it is the intent of the Town to irrigate from City water lines, but they may decide to irrigate from the creek in the near future and therefore the bid item. Item #94 is actually addressed in Addendum # 1 which should be sent out by the Town this afternoon or tomorrow morning at the latest. The meters are actually on the domestic water lines and we have added one as well, so sorry for the confusion. _____ From: Jarvis Ward [mailto:jward@ntexcon.com] Sent: Wednesday, November 18, 2009 1:57 PM To: Bruce Dunne Subject: Vitruvian Park Bruce, I have a couple of concerns from my landscape sub. Please see the comments below. Item # 275 - Irrigation Skid N Pump, is not in the drawings. Item # 94 - 1.5" Irrigation Meter w/ Backflow Preventer & Box, is not on the drawings. Jarvis Ward North Texas Contracting, Inc. General Contractors P.O. Box 468 4999 Keller Haslet Rd Keller, TX 76248 Office: (817) 430-9500 Fax: (817) 430-9207 Cell: (817) 819-4813