Bill, Today after the weekly progress meeting Tom Forest with the Town of Addison asked how the water well design was progressing. I informed him that we had copied the water rights permit and Lou in Waco was working on it. I also stated I check with you and get an update for the Town. Thanks Wade Geistweidt Engineering Tech 2035 Central Circle Suite 110 McKinney, TX 75069 o| 972.562.4677 c| 469.576.9951 f | 972.542.4366