Meeting Minutes For "Construction Meetings" Meeting No. 10 As of 28-Jul-2010 3:50 PM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Published Date/Place 22-Jul-2010 9:00 AM CT at Construction Trailer Prepared By Eric Little Attendees Bruce Dunne Jennifer Haynes Brian LaFoy Eric Little Brad Rusk Dave Wilde Other Attendees tlamberth@udr.com ldunn@addisontx.gov Statement Next Meeting 29-Jul-2010 9:00 AM CT at Construction Trailer Old Business Topic 1.1 Mitigation Requirements In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT Discussed the following items that need to go back in front of CoE for possible changes: 1. Channel bottom - currently the mit plan states that the channel bottom must stay in place until the new creek walls are installed. The issue is the new walls are at a lower elevation than the existing channel bottom. 2. ABR is requesting to be able to add 3 low water crossings. 3. Creek bottom excavation at existing weir - vac vs excavation. Discussed NTC's pending dewater plan - need formal submittal. Status: In Progress Assigned To: Bruce Dunne Jennifer Haynes Brian LaFoy Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT UDR/ICON/KBA to put together list for discussion with USACOE that includes: 1. Austin Bridge and Road is requesting to add 2 low water crossings (see the Creek Crossings attached) to facilitate their work at the two vehicular bridges. 2. Page 2 of the mitigation plan currently requires us to install the vertical concrete creek walls prior to removing the excavation of the channel bottom. The proposed elevations of these walls make this unconstructable. We need relief here in order to be able to complete the creek walls and the demo of the existing concrete channel at the Bella Bridge. 3. The requirement to remove the existing sediment at the existing weir via vacuum instead of by excavator. The sediment in this area is upwards to 8 feet in depth - removing it by vacuum may be nearly impossible. We need relief on this to be able to use an excavator to remove this sediment. 4. NTC dewatering plan - would like your review of the attached de-water plan. 5. Any additional work we may want to do to address the erosion along the creek bank south of Ponte and on the FB side of the existing weir - see attached email from Brian LaFoy for reference. 6. Alternate seed proposed along the creek bank south of Ponte - see attached email for reference. Also Kleinfelder to perform GPR testing on existing weir to help figure out how it was built. Status: In Progress Assigned To: Bruce Dunne Wade Geistweidt Brian LaFoy Eric Little Cy Reichert Brad Rusk Due Date: - TBA - Topic 1.2 Construction Schedule In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT Sanitary Sewer manhole lowered and backfilled. Upper lake walls complete. NTC is to submit a master schedule update at the next meeting. Status: In Progress Assigned To: Jennifer Haynes Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT NTC to submit revised master schedule today. Lower grotto pier to start today, east side of islands 2 & 3 are underway, the tree protection deck will pour Friday, the Wildlife Observation Deck will be complete next week and the median plantings to be complete by August 26th. Status: In Progress Assigned To: Jennifer Haynes Due Date: - TBA - Topic 2.3 SWPPP Plan In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT Discussed revised design on rock check dam at existing weir. Status: In Progress Assigned To: Bruce Dunne Jennifer Haynes Brian LaFoy Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT NDM and ToA have approved the revised design and pricing for the new rock check dam at the existing weir. Work is now complete. Pending change order approval. Status: In Progress Assigned To: Clay Barnett Due Date: - TBA - Topic 4.2 Submittals In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT 1. Dakota Granite (#2 - NTC) - Revise and Resubmit Pending NTC 2. Soil Nail Walls (#8 - NTC) - Resubmit is complete. Pending discussions with Kleinfelder and Olden. 3. Rebar Shops (#11 - NTC) - Viewtech replied. Pending NTC. 4. False Weir (#12 - ICON) - Joel has reviewed - pending Viewtech 5. Electrical Submittal - Resubmitted by NTC as Submittal #15 6. NTC to submit concrete pole colors for approval - Town approved #113 natural Gray Flat Sealer 7. NTC to submit creek dewater plan for comment and approval. 8. Screen Wall (#16) - pending discussion of who reviews (ToA requested NDM review). 9. Limstone Cap (#17) - Mock up has been reviewed - discuss attachment detail Status: In Progress Assigned To: Wade Geistweidt Jennifer Haynes Brian LaFoy Eric Little Joel Massey Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT Edit Discussion | Delete DiscussionMeeting Date: 15-Jul-2010 9:00 AM CT 1. Dakota Granite (#2 - NTC) - Revise and Resubmit Pending NTC 2. Soil Nail Walls (#8 - NTC) - CLOSED. 3. Rebar Shops (#11 - NTC) - Viewtech replied. Pending NTC. 4. False Weir (#12 - ICON) - CLOSED. 5. Electrical Submittal - Pending Bridge Electrical Review 6. NTC has submitted creek dewater plan for comment and approval. 8. Screen Wall (#16) - NDM has reviewed - Kleinfelder review pending. 9. Limstone Cap (#17) - Mock up has been reviewed - pending approval by UDR and ToA. NTC to submit $ for new connection detail. 10. Fountain Vault/Hotbox and Fountian Finishes - pending NTC and KSS. Status: In Progress Assigned To: Jennifer Haynes Robyn Jacobson Eric Little Joel Massey Due Date: - TBA - Topic 5.1 RFI Log In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT #10 - Interior (Belled) Piers at Wildlife Observation Deck - Open in Rebcon's court #13 - False Weir - (Greenscapes) - COMPLETE #14 - False Weir fill valve - (Greenscapes) - Pending ICON and Greenscape's comments #16 - Exposed Conduits at Grotto - (Kevin Slone) - ICON and KSS have replied, pending Viewtech comments. Discussed #22 - Expansion and Construction Joints being critical. NTC to write RFI concerning low breaks on piers. Status: In Progress Assigned To: Jennifer Haynes Joel Massey Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT #10 - Interior (Belled) Piers at Wildlife Observation Deck - CLOSED #14 - False Weir fill valve - Pending ICON and Greenscape's comments #16 - Exposed Conduits at Grotto - All questions answered, pending NTC review and comment. #21 - Anemometer Conduit - Overdue - in ICON court. #22 - Expansion and Construction Joints being critical - Sketches sent to NTC - pending their reveiw to close RFI. #24 - Clay Liner - Discuss with all parties #26 - Irrigation Sleeves to Islands - in ICON court #27 - Street Fountain Finishes - UDR open issue with KSS/Greenscapes Status: In Progress Assigned To: Bruce Dunne Wade Geistweidt Jennifer Haynes Robyn Jacobson Joel Massey Due Date: - TBA - Topic 5.3 Corridination Between Bridge Package and Park Package In Progress -- Due Now Meeting Date: 8-Jul-2010 9:00 AM CT ICON has received CAD drawings. Indicates that their are some more design issues that need to be solved. Will send over list in writing prior to meeting next Thursday. Status: In Progress Assigned To: Eric Christiansen Joel Massey Due Date: - TBA - Meeting Date: 15-Jul-2010 9:00 AM CT Need to discuss results of design coordination meeting. Status: In Progress Assigned To: Eric Christiansen Bruce Dunne Joel Massey Due Date: - TBA - Topic 5.4 Limestone Caps at Creek Walls In Progress -- Due Now Meeting Date: 17-Jun-2010 1:30 PM CT NTC stated that they can provide limestone caps at no additional cost on the creek walls. This option was on the table originally, but cost and durablity issues shelved it. Need final detirmination on this ASAP. Status: In Progress Assigned To: Clay Barnett Eric Little Due Date: - TBA - Meeting Date: 8-Jul-2010 9:00 AM CT Connection detail needed for limestone caps. Status: In Progress Assigned To: (none) Due Date: - TBA - Meeting Date: 15-Jul-2010 9:00 AM CT NTC drilled through the tops of the caps and anchored with grout. ToA and UDR do not like. Discuss alternate attachment detail. Status: In Progress Assigned To: Jennifer Haynes Eric Little Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT NTC to price alternate attachment detail which will include drilling into bottom of cap 3/4 depth of the cap thickness and epoxy to dowel. Status: In Progress Assigned To: Jennifer Haynes Due Date: - TBA - Topic 6.2 Water Well In Progress -- Due Now Meeting Date: 24-Jun-2010 9:00 AM CT ICON still attempting to get pricing from local drillers to do this. So far no response. Status: In Progress Assigned To: Bruce Dunne Due Date: - TBA - Topic 6.3 Bridge Ped Rail Usage in Park In Progress -- Due Now Meeting Date: 24-Jun-2010 9:00 AM CT Town would like to look at using the vertical cable rail currently designed on the bridge through-out the park. UDR to send NTC detail for pricing. Status: In Progress Assigned To: Jennifer Haynes Eric Little Due Date: - TBA - Meeting Date: 8-Jul-2010 9:00 AM CT UDR has send detail. Pending NTC pricing. Status: In Progress Assigned To: Jennifer Haynes Due Date: - TBA - Topic 6.4 Street Fountain Installation In Progress -- Due Now Meeting Date: 8-Jul-2010 9:00 AM CT ICON submitted drawings for discussion. UDR to review and approve. Attachment: Vitruvian Park Street Fountain Equipment Exhibits.msg Status: In Progress Assigned To: Eric Little Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT UDR reviewed and approved drawings. Need to finalize discussions on fountain finishes. Status: In Progress Assigned To: Clay Barnett Jennifer Haynes Eric Little Due Date: - TBA - Topic 8.1 Construction Entrance In Progress -- Due Now Meeting Date: 8-Jul-2010 9:00 AM CT NTC to install a construction entrance -- discuss with UDR regarding size and coordination for install. Status: In Progress Assigned To: Jennifer Haynes Due Date: - TBA - Meeting Date: 15-Jul-2010 9:00 AM CT NTC to meet with Andres next week. Status: In Progress Assigned To: Jennifer Haynes Due Date: - TBA - NEW! Meeting Date: 22-Jul-2010 9:00 AM CT NTC and Andres to meet and discuss. Status: In Progress Assigned To: Jennifer Haynes Nick Jacob Due Date: - TBA - New Business No new items to display. Addendum N/A .................................................................................. Copyright (c) 1999-2010, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software 据⹥਍⸶䄠瑬牥慮整猠敥⁤牰灯獯摥愠潬杮琠敨挠敲步戠湡潳瑵⁨景倠湯整ⴠ猠敥愠瑴捡敨⁤浥楡潦⁲敲敦敲据⹥਍਍汁潳䬠敬湩敦摬牥琠数晲牯假⁒整瑳湩⁧湯攠楸瑳湩⁧敷物琠敨灬映杩牵⁥畯⁴潨⁷瑩眠獡戠極瑬മഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䈊畲散䐠湵敮圉摡⁥敇獩睴楥瑤ഉ䈊楲湡䰠䙡祯䔉楲⁣楌瑴敬ഉ䌊⁹敒捩敨瑲䈉慲⁤畒歳ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ吊灯捩ㄠ㈮ठ潃獮牴捵楴湯匠档摥 汵॥湉倠潲牧獥⁳ⴭ䐠敵丠睯ठ†ഉ䴊敥楴杮䐠瑡㩥਍㔱䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ慓楮慴祲匠睥牥洠湡潨敬氠睯牥摥愠摮戠捡晫汩敬⹤਍਍灕数⁲慬敫眠污獬挠浯汰瑥⹥਍਍呎⁃獩琠畳浢瑩愠洠獡整⁲捳敨畤敬甠摰瑡⁥瑡琠敨渠硥⁴敭瑥湩⹧਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍敊湮晩牥䠠祡敮ॳठ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍䕎⅗ഠ䴊敥楴杮䐠瑡㩥਍㈲䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ呎⁃潴猠扵業⁴敲楶敳⁤ 慭瑳牥猠档摥汵⁥潴慤⹹਍਍潌敷⁲牧瑯潴瀠敩⁲潴猠慴瑲琠摯祡‬慥瑳猠摩⁥景椠汳湡獤㈠☠㌠愠敲甠摮牥慷ⱹ琠敨琠敲⁥牰瑯捥楴湯搠捥楷汬瀠畯⁲牆摩祡‬桴⁥楗摬楬敦传獢牥慶楴湯䐠捥楷汬戠⁥潣灭敬整渠硥⁴敷步愠摮琠敨洠摥慩汰湡楴杮⁳潴戠⁥潣灭敬整戠⁹畁畧瑳㈠琶⹨਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍敊湮晩牥䠠祡敮ॳठ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍潔楰⁣⸲″匉偗偐倠慬८湉倠潲牧獥⁳ ⴭ䐠敵丠睯ठ†ഉ䴊敥楴杮䐠瑡㩥਍㔱䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ楄捳獵敳⁤敲楶敳⁤敤楳湧漠潲正挠敨正搠浡愠⁴硥獩楴杮眠楥⹲਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍牂捵⁥畄湮॥敊湮晩牥䠠祡敮ॳ਍牂慩慌潆ॹठ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍䕎⅗ഠ䴊敥楴杮䐠瑡㩥਍㈲䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ䑎⁍湡⁤潔⁁慨敶愠灰潲敶⁤桴⁥敲楶敳⁤敤楳湧愠摮瀠楲楣杮映牯琠敨渠睥爠捯档捥慤瑡琠敨攠楸瑳湩 ⁧敷物‮潗歲椠⁳潮⁷潣灭敬整‮敐摮湩⁧档湡敧漠摲牥愠灰潲慶⹬਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍汃祡䈠牡敮瑴 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ吊灯捩㐠㈮ठ畓浢瑩慴獬䤉牐杯敲獳ⴠ‭畄⁥潎⁷ ठ਍敍瑥湩⁧慄整ഺㄊⴵ畊⵬〲〱㤠〺‰䵁䌠ൔ ਍ㄉ‮慄潫慴䜠慲楮整⠠㈣ⴠ丠䍔
‭敒楶敳愠摮删獥扵業⁴敐摮湩⁧呎ൃഊ㈊‮潓汩丠楡慗汬⁳⌨‸‭呎⥃ⴠ删獥扵業⁴獩挠浯汰瑥⹥倠湥楤杮搠獩畣獳潩獮 眠瑩⁨汋楥普汥敤⁲湡⁤汏敤⹮਍਍⸳删扥牡匠潨獰⠠ㄣ‱‭呎⥃ⴠ嘠敩瑷捥⁨敲汰敩⹤倠湥楤杮丠䍔മഊ㐊‮慆獬⁥敗物⠠ㄣ′‭䍉乏
‭潊汥栠獡爠癥敩敷⁤‭数摮湩⁧楖睥整档਍਍⸵䔠敬瑣楲慣畓浢瑩慴‭敒畳浢瑩整⁤祢丠䍔愠⁳畓浢瑩慴ㄣവഊ㘊‮呎⁃潴猠扵業⁴潣据敲整瀠汯⁥潣潬獲映牯愠灰潲慶‭潔湷愠灰潲敶⁤ㄣ㌱渠瑡牵污䜠慲⁹汆瑡匠慥敬൲ഊ㜊‮呎⁃潴猠扵業⁴牣敥敤慷整⁲汰湡映牯挠浯敭瑮愠摮愠灰潲慶⹬਍਍⸸匠 牣敥慗汬⠠ㄣ⤶ⴠ瀠湥楤杮搠獩畣獳潩景眠潨爠癥敩獷⠠潔⁁敲畱獥整⁤䑎⁍敲楶睥⸩਍਍⸹䰠浩瑳湯⁥慃⁰⌨㜱
‭潍正甠⁰慨⁳敢湥爠癥敩敷⁤‭楤捳獵⁳瑡慴档敭瑮搠瑥楡൬ഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ圊摡⁥敇獩睴楥瑤䨉湥楮敦⁲慈湹獥ഉ䈊楲湡䰠䙡祯䔉楲⁣楌瑴敬ഉ䨊敯慍獳祥 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ上坅‡਍敍瑥湩⁧慄整ഺ㈊ⴲ畊⵬〲〱㤠〺‰䵁䌠ൔ ਍䔉楤⁴楄捳獵楳湯簠䐠汥瑥 ⁥楄捳獵楳湯敍瑥湩⁧慄整›㔱䨭汵㈭㄰‰㨹〰䄠⁍呃਍਍⸱䐠歡瑯⁡片湡瑩⁥⌨′‭呎⥃ⴠ删癥獩⁥湡⁤敒畳浢瑩倠湥楤杮丠䍔਍਍⸲匠楯慎汩圠污獬⠠㠣ⴠ丠䍔
‭䱃协䑅മഊ㌊‮敒慢⁲桓灯⁳⌨ㄱⴠ丠䍔
‭楖睥整档爠灥楬摥‮敐摮湩⁧呎⹃਍਍⸴䘠污敳圠楥⁲⌨㈱ⴠ䤠佃⥎ⴠ䌠佌䕓⹄਍਍⸵䔠敬瑣楲慣畓浢瑩慴‭敐摮湩⁧牂摩敧䔠敬瑣楲慣敒楶睥਍਍⸶丠䍔栠獡猠扵業瑴摥挠敲步搠睥瑡牥瀠慬潦⁲潣浭湥⁴湡⁤灡牰癯污മഊ㠊‮ 捓敲湥圠污⌨㘱
‭䑎⁍慨⁳敲楶睥摥ⴠ䬠敬湩敦摬牥爠癥敩⁷数摮湩⹧਍਍⸹䰠浩瑳湯⁥慃⁰⌨㜱
‭潍正甠⁰慨⁳敢湥爠癥敩敷⁤‭数摮湩⁧灡牰癯污戠⁹䑕⁒湡⁤潔⹁丠䍔琠畳浢瑩␠映牯渠睥挠湯敮瑣潩敤慴汩മഊㄊ⸰䘠畯瑮楡慖汵⽴潈扴硯愠摮䘠畯瑮慩楆楮桳獥ⴠ瀠湥楤杮丠䍔愠摮䬠卓മഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥刉扯湹䨠捡扯潳८਍牅捩䰠瑩汴॥潊汥䴠獡敳ॹ਍畄⁥慄整›‭䉔⁁‭††† ††††††††਍਍潔楰⁣⸵‱刉䥆䰠杯䤉牐杯敲獳ⴠ‭畄⁥潎⁷ ठ਍敍瑥湩⁧慄整ഺㄊⴵ畊⵬〲〱㤠〺‰䵁䌠ൔ ਍⌉〱ⴠ䤠瑮牥潩⁲䈨汥敬⥤倠敩獲愠⁴楗摬楬敦传獢牥慶楴湯䐠捥‭灏湥椠敒换湯猧挠畯瑲਍਍ㄣ″‭慆獬⁥敗物ⴠ⠠片敥獮慣数⥳ⴠ䌠䵏䱐呅൅ഊ⌊㐱ⴠ䘠污敳圠楥⁲楦汬瘠污敶ⴠ⠠片敥獮慣数⥳ⴠ倠湥楤杮䤠佃⁎湡⁤片敥獮慣数猧挠浯敭瑮൳ഊ⌊㘱ⴠ䔠灸獯摥䌠湯畤瑩⁳瑡䜠潲瑴‭䬨癥湩匠潬敮
‭䍉乏愠摮䬠卓栠 癡⁥敲汰敩Ɽ瀠湥楤杮嘠敩瑷捥⁨潣浭湥獴മഊ䐊獩畣獳摥⌠㈲ⴠ䔠灸湡楳湯愠摮䌠湯瑳畲瑣潩潊湩獴戠楥杮挠楲楴慣⹬丠䍔琠牷瑩⁥䙒⁉潣据牥楮杮氠睯戠敲歡⁳湯瀠敩獲മഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥䨉敯慍獳祥ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ上坅‡਍敍瑥湩⁧慄整ഺ㈊ⴲ畊⵬〲〱㤠〺‰䵁䌠ൔ ਍⌉〱ⴠ䤠瑮牥潩⁲䈨汥敬⥤倠敩獲愠⁴楗摬楬敦传獢牥慶楴湯䐠捥‭䱃协䑅਍਍ㄣ ‴‭慆獬⁥敗物映汩慶癬⁥‭敐摮湩⁧䍉乏愠摮䜠敲湥捳灡❥⁳潣浭湥獴਍਍ㄣ‶‭硅潰敳⁤潃摮極獴愠⁴片瑯潴ⴠ䄠汬焠敵瑳潩獮愠獮敷敲Ɽ瀠湥楤杮丠䍔爠癥敩⁷湡⁤潣浭湥⹴਍਍㈣‱‭湁浥浯瑥牥䌠湯畤瑩ⴠ传敶摲敵ⴠ椠䍉乏挠畯瑲മഊ⌊㈲ⴠ䔠灸湡楳湯愠摮䌠湯瑳畲瑣潩潊湩獴戠楥杮挠楲楴慣‭歓瑥档獥猠湥⁴潴丠䍔ⴠ瀠湥楤杮琠敨物爠癥楥⁷潴挠潬敳删䥆മഊ⌊㐲ⴠ䌠慬⁹楌敮⁲‭楄捳獵⁳楷桴愠汬瀠牡楴獥਍਍㈣‶‭牉楲慧楴 湯匠敬癥獥琠獉慬摮⁳‭湩䤠佃⁎潣牵൴ഊ⌊㜲ⴠ匠牴敥⁴潆湵慴湩䘠湩獩敨⁳‭䑕⁒灯湥椠獳敵眠瑩⁨卋⽓片敥獮慣数⁳਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍牂捵⁥畄湮॥慗敤䜠楥瑳敷摩ॴ਍敊湮晩牥䠠祡敮ॳ潒祢慊潣獢湯ഉ䨊敯慍獳祥 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ吊灯捩㔠㌮ठ潃牲摩湩瑡潩敂睴敥牂摩敧倠捡慫敧愠摮倠牡慐正条॥湉倠潲牧獥⁳ⴭ䐠敵丠睯ठ†ഉ䴊敥楴杮䐠瑡㩥਍ⴸ畊⵬〲〱㤠 〺‰䵁䌠ൔ ਍䤉佃⁎慨⁳敲散癩摥䌠䑁搠慲楷杮⹳䤠摮捩瑡獥琠慨⁴桴楥⁲牡⁥潳敭洠牯⁥敤楳湧椠獳敵⁳桴瑡渠敥⁤潴戠⁥潳癬摥‮楗汬猠湥⁤癯牥氠獩⁴湩眠楲楴杮瀠楲牯琠敭瑥湩⁧敮瑸吠畨獲慤⹹਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍牅捩䌠牨獩楴湡敳८潊汥䴠獡敳ॹ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍敍瑥湩⁧慄整ഺㄊⴵ畊⵬〲〱㤠〺‰䵁䌠ൔ ਍三敥⁤潴搠獩畣獳爠獥汵獴漠⁦敤楳湧挠潯摲湩瑡潩敭瑥湩⹧਍ 瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍牅捩䌠牨獩楴湡敳८牂捵⁥畄湮॥਍潊汥䴠獡敳ॹठ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍潔楰⁣⸵‴䰉浩獥潴敮䌠灡⁳瑡䌠敲步圠污獬䤉牐杯敲獳ⴠ‭畄⁥潎⁷ ठ਍敍瑥湩⁧慄整ഺㄊⴷ畊⵮〲〱ㄠ㌺‰䵐䌠ൔ ਍三䍔猠慴整⁤桴瑡琠敨⁹慣牰癯摩⁥楬敭瑳湯⁥慣獰愠⁴潮愠摤瑩潩慮潣瑳漠桴⁥牣敥慷汬⹳吠楨⁳灯楴湯眠獡漠桴⁥慴汢⁥牯杩湩污祬‬畢⁴潣瑳愠摮搠牵扡楬祴椠 獳敵⁳桳汥敶⁤瑩മഊ上敥⁤楦慮敤楴浲湩瑡潩湯琠楨⁳十偁മഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䌊慬⁹慂湲瑥ॴ牅捩䰠瑩汴॥਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍敍瑥湩⁧慄整ഺ㠊䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ潃湮捥楴湯搠瑥楡敮摥摥映牯氠浩獥潴敮挠灡⹳਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›渨湯⥥਍畄⁥慄整›‭䉔⁁‭†††††††††††਍ഉ䴊敥楴杮䐠瑡㩥਍㔱䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ 呎⁃牤汩敬⁤桴潲杵⁨桴⁥潴獰漠⁦桴⁥慣獰愠摮愠据潨敲⁤楷桴朠潲瑵‮潔⁁湡⁤䑕⁒潤渠瑯氠歩⹥䐠獩畣獳愠瑬牥慮整愠瑴捡浨湥⁴敤慴汩മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥䔉楲⁣楌瑴敬ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ上坅‡਍敍瑥湩⁧慄整ഺ㈊ⴲ畊⵬〲〱㤠〺‰䵁䌠ൔ ਍三䍔琠牰捩⁥污整湲瑡⁥瑡慴档敭瑮搠瑥楡桷捩⁨楷汬椠据畬敤搠楲汬湩⁧湩潴戠瑯潴景挠灡㌠㐯搠灥桴漠⁦桴⁥慣 ⁰桴捩湫獥⁳湡⁤灥硯⁹潴搠睯汥മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ吊灯捩㘠㈮ठ慗整⁲敗汬䤉牐杯敲獳ⴠ‭畄⁥潎⁷ ठ਍敍瑥湩⁧慄整ഺ㈊ⴴ畊⵮〲〱㤠〺‰䵁䌠ൔ ਍䤉佃⁎瑳汩瑡整灭楴杮琠敧⁴牰捩湩⁧牦浯氠捯污搠楲汬牥⁳潴搠桴獩‮潓映牡渠敲灳湯敳മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䈊畲散䐠湵敮 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††† †††††††ഠഊ吊灯捩㘠㌮ठ牂摩敧倠摥删楡獕条⁥湩倠牡५湉倠潲牧獥⁳ⴭ䐠敵丠睯ठ†ഉ䴊敥楴杮䐠瑡㩥਍㐲䨭湵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ潔湷眠畯摬氠歩⁥潴氠潯瑡甠楳杮琠敨瘠牥楴慣慣汢⁥慲汩挠牵敲瑮祬搠獥杩敮⁤湯琠敨戠楲杤⁥桴潲杵⵨畯⁴桴⁥慰歲മഊ唊剄琠敳摮丠䍔搠瑥楡潦⁲牰捩湩⹧਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍敊湮晩牥䠠祡敮ॳ牅捩䰠瑩汴॥਍畄⁥慄整›‭䉔⁁‭†††††††††††਍ ਍敍瑥湩⁧慄整ഺ㠊䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ䑕⁒慨⁳敳摮搠瑥楡⹬倠湥楤杮丠䍔瀠楲楣杮മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ吊灯捩㘠㐮ठ瑓敲瑥䘠畯瑮楡湉瑳污慬楴湯䤉牐杯敲獳ⴠ‭畄⁥潎⁷ ठ਍敍瑥湩⁧慄整ഺ㠊䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ䍉乏猠扵業瑴摥搠慲楷杮⁳潦⁲楤捳獵楳湯‮䑕⁒潴爠癥敩⁷湡⁤灡牰癯⹥਍瑁慴档敭瑮›楖牴癵慩慐歲匠牴 敥⁴潆湵慴湩䔠畱灩敭瑮䔠桸扩瑩⹳獭⁧格瑴㩰⼯摵⹲牰橯捥浴瑡獥挮浯倯潲敪瑣慭整⽳潃敲氯杯湩愮灳㽸捁散獳祔数䔽䅍䱉䥖坅搦睯汮慯㵤☱楆敬慎敭ㄽ䍂㔳ㅆ㠳䐷㠷䔸䄲㝆㕆㕆䐶ㄷ㝄ㅃ㕄䌶㐷㑅㤴䍁㝁㕆㘷ㄵ䈰〲䌸㔴㕂䍂い㤵䑅䐵㔸㌷䌰㈳㙂㠸䔹㠸䈰䑆ぃ〷ㅆ䄰㉄䈱㡃㔴䄳〶㉅㔳䐰㑁㝄㕁䑆㐷あ䔲䈸䕁㸸ഠ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䔊楲⁣楌瑴敬 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ上坅‡਍敍瑥湩⁧慄整ഺ㈊ⴲ 畊⵬〲〱㤠〺‰䵁䌠ൔ ਍唉剄爠癥敩敷⁤湡⁤灡牰癯摥搠慲楷杮⹳丠敥⁤潴映湩污穩⁥楤捳獵楳湯⁳湯映畯瑮楡楦楮桳獥മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䌊慬⁹慂湲瑥ॴ敊湮晩牥䠠祡敮ॳ਍牅捩䰠瑩汴॥ठ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍潔楰⁣⸸‱䌉湯瑳畲瑣潩湅牴湡散䤉牐杯敲獳ⴠ‭畄⁥潎⁷ ठ਍敍瑥湩⁧慄整ഺ㠊䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ呎⁃潴椠獮慴汬愠挠湯瑳畲瑣潩湥牴湡散ⴠ‭楤捳獵⁳楷 桴唠剄爠来牡楤杮猠穩⁥湡⁤潣牯楤慮楴湯映牯椠獮慴汬മഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥 ഉ䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ䴊敥楴杮䐠瑡㩥਍㔱䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ呎⁃潴洠敥⁴楷桴䄠摮敲⁳敮瑸眠敥⹫਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍敊湮晩牥䠠祡敮ॳठ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍䕎⅗ഠ䴊敥楴杮䐠瑡㩥਍㈲䨭汵㈭㄰‰㨹〰䄠⁍呃਍ഠऊ呎⁃湡⁤ 湁牤獥琠敭瑥愠摮搠獩畣獳മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䨊湥楮敦⁲慈湹獥三捩慊潣ॢ਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍†਍敎⁷畂楳敮獳ठ†ठ਍ഉ上敮⁷瑩浥⁳潴搠獩汰祡മഊഊഊ䄊摤湥畤 ഠऊ਍⽎⁁ഉഊഊഊ ठ†ഉഊ⸊⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮മ䌊灯特杩瑨⠠⥣ㄠ㤹ⴹ〲〱‬祓瑳浥瑡獥‬湉⹣嘠敩⁷桴⁥獕牥䄠牧敥敭瑮㰠瑨灴⼺眯 睷瀮潲敪瑣慭整⹳潣⽭牐橯捥浴瑡獥䌯牯⽥獕牥杁敲浥湥䅴汬愮灳‾映牯氠来污爠獥牴捩楴湯⁳湡⁤整浲⁳景甠敳愠灰楬慣汢⁥潴琠楨⁳楳整‮਍獕⁥景琠楨⁳楳整猠杩楮楦獥礠畯⁲条敲浥湥⁴潴琠敨琠牥獭漠⁦獵⁥灳捥晩敩⁤湩琠敨唠敳⁲杁敲浥湥⹴ഠ倊潲敪瑣慭整⁳‭桔⁥慃楰慴牐橯捥⁴慍慮敧敭瑮匠景睴牡⁥格瑴㩰⼯睷⹷牰橯捥浴瑡獥挮浯‾ഠഊ